P
age 5
Installation Guide | April 2021
ClockedIn
1C Uppingham Gate, Ayston road, Uppingham, Rutland, LE15 9NY
0845 4 903 901 | [email protected] | clockedin.uk
List of components for a WiFi installation – NOT Supplied
1.
Wall fixings
a.
Screws
b.
Wall plugs
c.
Washers
Solid Wall Fixings
Dry lining / Stud wall Fixing
2.
Cable Trunking
3.
LAN / ethernet Cable (if required)
6.
Tools Required for Installation
1.
Power Drill
2.
Masonry drill bit (7mm)
3.
Screw Driver (posi)
4.
Screw Driver (flat)
5.
Wire cutters
6.
Electricians screw driver – Small (flat)
7.
Hacksaw
7.
Installation Stage 1
Select desired location for OnTime hardware. This must be within 3 metres of a power supply. The
length of the power supply cable is 3m.
Please note the distance of kiosk from the power supply is dictated by the route of the power cable
rather than ‘line of sight.’
The height of the unit is recommended to be between 1.1m and 1.4m from floor level to the bottom of
the kiosk.
Considerations for installation:
1.
Height of users
2.
Disabled users
3.
Location of power supply
4.
Location of ethernet / LAN port
5.
Not in Direct Sunlight (at any time of day)
6.
Not in High traffic area for goods carts / trolleys
7.
Not obstructed by furniture
8.
Not obstructed by or in close proximity to doors
Micro
Router
Power Supply
Содержание OnTIme
Страница 1: ......