HCS-D User Manual
17
Only 3 wires are connected, but care must be taken that the service
transformer secondary connection is
definitely
known, and the
3 wires from the main circuit breaker panel are connected and
labeled correctly.
Figures 2
,
3
, and
4
show the most common
service transformer secondary wiring formats.
Notice that L1, L2, & Ground are labeled on each diagram. Those
transformer outputs correspond to the same inputs on the HCS-D.
Also, each of the two 3-phase diagrams shows an L3 output, which
is not used. Do not connect all three phases of a 3-phase secondary
to the HCS-D. This is a single-phase device.
The Neutral at the service panel
must
be connected to Earth
Ground
somewhere
in the system on
any
of the three connection
arrangements. Ground-fault protection is not possible unless the
Neutral (center-tap on the service transformer) is connected to an
Earth Ground. If no Ground is provided by the electrical service, a
grounding stake must be driven into the Ground nearby, following
local electrical codes. The grounding stake must be connected to
the ground bar in the main breaker panel, and Neutral connected to
Ground at that point.
WARNING
: Local electrical codes must always be
followed when installing the grounding stake.
AVERTISSEMENT:
Les codes électriques locaux doivent
toujours être respectées lors de l’installation du piquet de
mise à la terre.
ADVERTENCIA
: Siempre se deben seguir los códigos
eléctricos locales, a la hora de instalar la estaca de conexión
a tierra.
Содержание HCS-D Series
Страница 1: ...ClipperCreek Inc Innovative Infrastructure for Electric and Hybrid Vehicles Model HCS D User Manual ...
Страница 26: ...HCS D User Manual 26 Figure 6 Mounting the HCS D to a Solid Wall Solid Wall Mounting flush Longer ...
Страница 40: ...ClipperCreek Inc 11850 Kemper Rd Suite E Auburn CA 95603 www ClipperCreek com 877 694 4194 ...