![ClimaLine PANCAKE 2 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/climaline/pancake-2/pancake-2_assembly-instructions-manual_2624568004.webp)
S t e p
E
– F i t t i n g t h e h e a t i n g p u m p
Now fit the outdoor unit onto the vibration dampers by moving the
heating pump’s feet holes to the vibration dampers’ threaded rods.
When the pump is in place, secure it in the vibration dampers with
flat washers and nuts.
Centre on the rear left-hand corner of the outdoor unit.
Hose tie
NB: No additional plugs are
needed if you are drilling into
wood/concrete/a tiled wall.
Attach the enclosed hose ties. These are fitted with a maximum of 400 mm of space
between them, with an inclination of approx. 5°. Drill using a 6 mm drill. Then press the
drainage hose into these hose ties. Drainage hose for service water wells, for example
downpipes, external stone caissons or for suitable drains within the building.
For new installation of heating pump
You can check the bottom of the pump to ensure that all the
drainage holes are covered by the tray when it is in place.
Make sure that the stand IS BALANCED
S t e p
F
– C o n n e c t i o n o f e l e c t r i c i t y
Attach the connection cable to an earthed wall socket.
A suitable fuse is 10A/220 - 240v/50Hz
Tools/equipment:
13 mm box wrench
Screwdriver
Cable puller
earthed outside wall socket, double
ClimaLine Pancake Heat Pan | Patent 539 251 | Produced by Climaco
4
M O N T A G E A N V I S N I N G