R
R
www.climacoolcorp.com
54
Basket Strainers
function, not by the size of the pipeline.
Pre Installation Checklist:
1.
ǯƪ
ǯƪ
free of defects. The pipeline should also be checked for
proper alignment. Strainers should never be utilized to
realign an existing piping system.
2.
ǯƪ
type as the basket strainer being installed. Raised face
ƪ ƪ ƪǤ
3.
Ensure that the pipeline setup allows a horizontal
installation of the basket strainer.
ϰ͘
If pipeline strain is a concern when installing larger
basket strainers (6” and above), a concrete or steel pad
should be used to provide additional support. Larger
Ƥ
reducing strain on the pipeline.
5.
If the basket strainer is to be located on the discharge
side of a pump, then a safety release valve must be
installed between the basket strainer and the pump.
Installation Procedure:
1.
To provide for easier maintenance, the basket strainer
should be located where the drain plug can be removed
and where there is ample space above the basket
strainer for screen removal.
2.
Before placing the basket strainer into place, support
the existing pipeline with pipe supports near the inlet
and outlet connections of the basket strainer.
3.
Place the basket strainer into the pipeline ensuring that
ƪ
ƪǤ
or heavy strainers, lift the basket strainer into place
using slings positioned underneath the inlet and outlet
connections.
Figure 38 - Installed Basket Strainer with Bolted Cover
Figure 39: Bolting Sequence Pattern
ǣ
ƪǤ
ƪǤ
Operation
Once proper installation has been successfully completed,
start the system gradually, at start up as well as after shut
down. This eliminates sudden shock to the strainer and
other equipment in the line. This is extremely important for
steam service.
Start-Up Procedure
1.
Remove air from the pipeline by opening the vent near
the basket strainer.
Note:
With piping systems that
ƪ
͕͖͔η ǡƪ
safe area, away from the operator. Operators should
Ƥȋǡ
gloves, vests etc.) when venting or servicing
is performed.
2.
Start the piping system by opening the outlet valve
ǯƤǤ
open the inlet valve nearest the basket strainer’s
ǡ͖͙ΨƪǤ
It is important to start the system gradually to avoid
displacing or damaging the basket strainer.
3.
Continue to open the inlet valve until the desired service
ƪ Ǥ
Basket
Strainer
Cover
Basket
Strainer
Screen
Pipeline Flow
ϰ͘
ȋͽΤdz
Ȍƪ
ƪǡ
Ǥ
ƪ
tighten. Flange bolts should then be tightened, using
a star or crisscross pattern to evenly load the bolts, in
accordance with established piping standards. This is
Ƥ͗͝Ǥ
Содержание UCA 20
Страница 18: ...R R www climacoolcorp com 16 Wiring Diagram Voltage Phase Monitor ...
Страница 27: ...25 R R www climacoolcorp com Evaporator Water Pressure Drop Charts ...
Страница 61: ...59 R R www climacoolcorp com Wiring Diagram UCA020 Cooling Only 208 230v 460v ...
Страница 62: ...R R www climacoolcorp com 60 Wiring Diagram UCA020 Cooling Only 208 230v 460V ...
Страница 63: ...61 R R www climacoolcorp com Wiring Diagram UCA020 HeatPump 208 230v 460v ...
Страница 64: ...R R www climacoolcorp com 62 Wiring Diagram UCA020 HeatPump 208 230v 460v ...
Страница 65: ...63 R R www climacoolcorp com Wiring Diagram UCA020 Heat Pump 575v ...
Страница 66: ...R R www climacoolcorp com 64 Wiring Diagram UCA020 Heat Pump 575v ...
Страница 67: ...65 R R www climacoolcorp com Wiring Diagram UCA020 SHC Heat Pump 208 230v 460v ...
Страница 68: ...R R www climacoolcorp com 66 Wiring Diagram UCA020 SHC Heat Pump 208 230v 460v ...
Страница 69: ...67 R R www climacoolcorp com Wiring Diagram UCA030 Cooling Only 208 230v 460v ...
Страница 70: ...R R www climacoolcorp com 68 Wiring Diagram UCA030 Cooling Only 208 230v 460v ...
Страница 71: ...69 R R www climacoolcorp com Wiring Diagram UCA030 Cooling Only 575v ...
Страница 72: ...R R www climacoolcorp com 70 Wiring Diagram UCA030 Cooling Only 575v ...
Страница 73: ...71 R R www climacoolcorp com Wiring Diagram UCA030 Heat Pump 208 230v 460v ...
Страница 74: ...R R www climacoolcorp com 72 Wiring Diagram UCA030 Heat Pump 208 230v 460v ...
Страница 75: ...73 R R www climacoolcorp com Wiring Diagram UCA030 Heat Pump 575v ...
Страница 76: ...R R www climacoolcorp com 74 Wiring Diagram UCA030 Heat Pump 575v ...
Страница 77: ...75 R R www climacoolcorp com Wiring Diagram UCA030 SHC Heat Pump 208 230v 460v ...
Страница 78: ...R R www climacoolcorp com 76 Wiring Diagram UCA030 SHC Heat Pump 208 230v 460v ...
Страница 79: ...77 R R www climacoolcorp com Wiring Diagram UCA030 SHC Heat Pump 575v ...
Страница 80: ...R R www climacoolcorp com 78 Wiring Diagram UCA030 SHC Heat Pump 575v ...
Страница 81: ...79 R R www climacoolcorp com Wiring Diagram UCF030 Free Cooling 208 230v 460v ...
Страница 82: ...R R www climacoolcorp com 80 Wiring Diagram UCF030 Free Cooling 208 230v 460v ...
Страница 83: ...81 R R www climacoolcorp com Wiring Diagram UCF030 Free Cooling 575v ...
Страница 84: ...R R www climacoolcorp com 82 Wiring Diagram UCF030 Free Cooling 575v ...
Страница 85: ...83 R R www climacoolcorp com Wiring Diagrams UCA070 Cooling Only 208 230v 460v ...
Страница 86: ...R R www climacoolcorp com 84 Wiring Diagrams UCA070 Cooling Only 208 230v 460v ...
Страница 87: ...85 R R www climacoolcorp com Wiring Diagrams Master Control Panel ...
Страница 88: ...R R www climacoolcorp com 86 Wiring Diagrams Master Control Panel ...
Страница 89: ...87 R R www climacoolcorp com Wiring Diagrams Expansion Board SHC Heat Pump ...