Boom Operation
6m Hydraulic/Electric Boom
8m Hydraulic / Electric Boom
The 6m boom has 4 nozzles per boom section at 50cm spacing. The 8m boom has 4 nozzles in the centre,
3 nozzles on the first section and 3 nozzles on the second section. The boom is equipped with spring
adjusted break
-
back devices in case of collision. The tension on the springs can be adjusted by the 30mm
nut on top of the boom hinge. Do not make too tight. Doing so can cause too much rigidity and cause the
boom to bend in there is collision. Usually 20 to 25mm of thread above the adjustment nut is adequate.
To open the boom:
•
You will have 2 switches mounted on a box which has a 12v feed near the drivers position
•
You can open either boom at any time or both booms together. There is a fuse for each switch un-
derneath the switch on the external area of the switch box
On a weekly basis, APPLY GREASE to the folding mechanism when the boom arm is half way between be-
ing full open and fully closed.
WARNING: DO NOT MOVE THE BOOM ARM WHEN YOU ARE GREASING
THE BOOM HINGE. YOU MAY TRAP YOUR FINGERS IN THE MECHANISM. TAKE NOTE
Golf 8m
Golf 6m