CE-975
Operator’s Manual
Page 4
CE-975
Operator’s
Manual
VI. Operation steps:
1. Turn on the power switch (look at whether the voltage is normal), start the cooling fan, delay for 5 seconds and make the
main circuit work, press the seal switch to make the seal work.
Note: it is prohibited to continuously and rapidly switch on and off the power supply and seal switch! Wait for at least 5
seconds after turning off the power switch, then re-open the power supply, or else, it would be easy to damage the equipment.
2. Adjust the sensing head to make it higher than the sealed object by 1 to 3mm. Place the sealed objects on both ends of the
sensor head, and check whether the sensor head and the conveyor belt are parallel. If not parallel, adjust the pillar below the conveyor
belt to make it parallel.
3. According to the bottle diameter, select the sealing range of the sensor head.
4. Press down the sealing switch, and try sealing. If the sealing is not firm, reduce the speed of conveyor belt. If
the sealing membrane is burnt, increase the conveyor speed or increase the sensor head. After the
requirements on sealing quality are met, continuous automatic sealing operation can start.
5. To ensure that the seal will be always in the best working condition, conduct the sealing process
test, to identify the optimum process parameters and make records. After debugging is done, prevent
accidental changes in the normal production. Also conduct regular sampling, to avoid sealing of the
substandard products.
6. When the operating current is excessive, the machine’s over-current protection function is
activated, and the conveyor belt automatically stops working. At this time, appropriately pull up the
spacing between sensor head and sealed object, to reduce the operating current. After adjustment, re -boot
the machine to proceed with the sealing operation.
7. When the temperature of main circuit of the equipment is excessively high, the thermal overload
protection function is activated, and the equipment automatically stops working. After the temperature
drops to the normal state, the equipment will automatically start the sealing operation.
VII. Maintenance and repair:
1. The machine is electromechanical integration equipment. In order to avoid the equipment
appliance from premature aging and damage, the working environment must remain clean and dry. Also,
it is prohibited to use the machine in environment of high humidity, high corrosion, and high dust.
2. The instrument switches on the operator control panel shall not be immersed with water or other
liquids, so as not to cause damage or leakage. During operation, do not use excessive force, so as to
extend the service life.
3. The transmission part should be often added with the proper amount of lubricants, and no
phenomena of blockade or serious friction should exist.
4. The sensor head and the electrical appliance in the chassis have high-voltage electricity. The
untrained professional electrician shall not open the sensor head and the back cover of the electrical box,
to avoid electric shock accidents.