
7 / 10
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
E:
Tel: +86 592 311 0088 | SHA:603628
between the rail joints and
then loosely tighten the M8
Allen bolt.
Note:
Skip this step if the rail is
long enough and no need to
splice.
4.2.3
Affix the Rails and Klip-lok
Interface by Rail Clamp.
Recommend torque of M8
bolt is 18N.m
4.2.4
Repeat above steps and
install the rest of Rails.
Adjust Rails
’
position with
String, and align all ends of
Rails.