
9 / 10
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
E:
Tel: +86 592 311 0088 | SHA:603628
4.3.4
To buckle to Clamps with
Z-module, put one leg of Z
module into the channel of
the Rail first, then press
second leg of Z module into
the channel.
4.3.5
Buckle the Inter Clamp into
the Rail and affix it to the
side face of PV-Module.
Don
’
t fasten the bolt to
make the installation of
second PV Module easier.