PV-ezRack SolarRoof 

Klip Lok Interface with B50 Rail 

Installation 

Guide V1.0 

 
 
 

 

 

 
 
 

Содержание V-ezRack SolarRoof

Страница 1: ...uoju Hi tech Ind Dev Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 PV ezRack SolarRoof Klip Lok Interface with B50 Rail...

Страница 2: ...installer is solely responsible for Complying with all applicable local or national building codes including any updates that may supersede this manual Ensuring that PV ezRack and other products are...

Страница 3: ...Driver Torque Wrench Allen Key 6mm for M8 Hexagon Socket Screw Tape String Note The tools in the figure are only used for installation of rack system not included in supply scope please consult syste...

Страница 4: ...lenergy com cn Tel 86 592 311 0088 SHA 603628 ER I 13 TH Klip lok Interface for Hidden 26 ER I 16 TH Klip lok interface for Standing seam 22 ER I 18 TH Interface for Standing Seam 20 ER I 20A TH Klip...

Страница 5: ...Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 3 System Overview 3 1 Overview of PV ezRack SolarRoof End Clamp U18 Inter...

Страница 6: ...y to maintain the required torque 3 Professional tools and tool belts are recommended 4 In some cases fasteners could be seized over time As an option if want to avoid galling or seizing of thread app...

Страница 7: ...String Place Klip lok Interface on the marked position as shown figures on the right 4 2 Rail Installation 4 2 1 To connect multiple rails together slide half of splices on the rear side of the pre as...

Страница 8: ...SHA 603628 between the rail joints and then loosely tighten the M8 Allen bolt Note Skip this step if the rail is long enough and no need to splice 4 2 3 Affix the Rails and Klip lok Interface by Rail...

Страница 9: ...n 4 3 1 According to your plan install all Rails 4 3 2 Mark the position of PV Module on Rails with Marker Pen Stretch a String as a reference to align PV Module Place the first PV Module on the marke...

Страница 10: ...Tel 86 592 311 0088 SHA 603628 4 3 4 To buckle to Clamps with Z module put one leg of Z module into the channel of the Rail first then press second leg of Z module into the channel 4 3 5 Buckle the I...

Страница 11: ...ce parallel to the stretched String and fasten the Inter Clamp Note Pay attention not to touch the stretched String when placing the PV Modules Recommend torque of M8 bolt is 13N m 4 3 7 Following the...