Clenergy SPH Installation and Operation Manual 

SPH Grid PV-inverter 

 

                             

 

 

 

 

 

 

 

 

Installation and Operation Manual 

 

SPH MODELS 

INCLUDED IN THIS MANUAL 

 

 

SPH15                                    1500W 

 

SPH20                                    2000W 

 

SPH30                                    3000W 

 

SPH40                                    4000W 

 

SPH50                                    5000W 

 

SPH60                                    6000W 

 

 

 

  N305 WeiYe Building, Pioneer Park XiaMen China 361006 

Tel: +86-592-5781288 

Fax: +86-592-5782298 

Website: www.clenergy.com.cn 

Содержание SPH15

Страница 1: ...V inverter Installation and Operation Manual SPH MODELS INCLUDED IN THIS MANUAL SPH15 1500W SPH20 2000W SPH30 3000W SPH40 4000W SPH50 5000W SPH60 6000W N305 WeiYe Building Pioneer Park XiaMen China 36...

Страница 2: ...e connected to other AC electric generators or power supplies This may cause permanent damage to the unit and or AC power supply The earth connection of the electric grid AC utility to the inverter sh...

Страница 3: ...onnected for at least 3 hours Due to risk of electric shock from energy stored in capacitors Please take out the unit from the packaging box carefully Check if there is any obvious damage Do not insta...

Страница 4: ...is manual contains important information for the safe and effective installation and operation of the SPH Grid PV Inverter Be sure to read this manual carefully before using the product If you encount...

Страница 5: ...H20 SPH30 Front view Bottom view External protective earth PE terminal Display and connections LCD Display Showing the inverter status RS232 Solar panel input DC Display information switch Optional co...

Страница 6: ...m view Display and connections External protective earth PE terminal LCD Display Showing the inverter status Display information switch Operation LED Blue Working Mode Operation LED Red fault status A...

Страница 7: ...ttom view Display and connections External protective earth PE terminal Display information switch LCD Display Showing the inverter status Operation LED Blue Working Mode Operation LED Red fault statu...

Страница 8: ...verter uses Maximum Peak Power Tracking MPPT to optimize the PV array operation and deliver maximum power to the electric grid Connection The interface between the SPH inverter and the System Grid usu...

Страница 9: ...to 55 C For best performance and service life the unit should be operated with an ambient temperature of 0 C to 40 C Above this temperature the power output may be reduced It is recommended to shade t...

Страница 10: ...There must be at least 25cm clear space above and below the unit This is to allow for proper air circulation and convection cooling 3 Mark the 4 mounting hole positions required using the mounting bac...

Страница 11: ...he unit is securely mounted Try to lift up the inverter at the bottom to test that it is firmly attached If not adjust the mounting as necessary CAUTION The electrical installation of this unit must o...

Страница 12: ...ure the selected wire conforms to local and national wiring codes Model mm AWG no 1500 1 29 16 2000 1 29 16 3000 1 72 14 4000 2 05 12 5000 2 85 8 6000 2 85 8 4 For SPH15 SPH20 SPH30 SPH40 connect AC w...

Страница 13: ...Step 3 Connect to the PV array DC 1 Make sure the maximum open circuit voltage Voc of each PV string is less than 550V UNDER ANY CONDITION for SPH15 SPH20 SPH40 and 600V for SPH50 SPH60 2 Ensure that...

Страница 14: ...ect Incorrect connection may permanently damage the unit Step 4 Test the installation 1 Remove any protective short circuits applied to the PV array output 2 Remove any shade material from the PV pane...

Страница 15: ...e display panel for more details Dark in normal or shutdown operation LCD display panel o Normal operation The display panel will show Working Mode during normal operation In Working Mode press the di...

Страница 16: ...de The display panel will then show Setting Each time the display button is pressed the setting changes to the next item Contrast setting Press button for over 5 seconds to enter Press button to selec...

Страница 17: ...KWH O P energy RATING xx KW PV Inverter Rating M CPU Ver xxx Firmware version of Mater CPU S CPU Ver xxx Firmware version of Slave CPU Display button is untouched for 5 Sec Yes No Display button is to...

Страница 18: ...d output ground leakage current too high Relay Failure Grid output relay failure DC INJ High Grid DC injection too high Ref 2 5V Fault 2 5V reference voltage internal circuit fault DC Sensor Fault Gri...

Страница 19: ...s PV panel voltage PV VOLT xxx xV PV panel DC voltage in Volts System fault Isolation failure Isolation Fault Earth fault of the PV panels or failure of surge voltage protection GFCI Ground Fault Curr...

Страница 20: ...ge Description Temperature than the permitted operating range Firmware Update Updating Master CPU firmware Master Flash The internal program is updating Master CPU through RS232 interface Updating Sla...

Страница 21: ...nit setting and download new firmware via the RS232 interface using PV_Reflash software 1 RS232 The SPH inverter is equipped with a 3 wire RS232 interface using a DB9 socket This is located under the...

Страница 22: ...perform other tests as below Do not remove the covers Warning Risk of Electric Shock Please follow the below instructions Visual Inspection 1 Check the status of the Inverter to AC utility connection...

Страница 23: ...e operating range if permitted by the electricity provider Impedance Fault 1 The grid impedance is higher than the permissible value 2 Wait for grid power to return to normal If the grid returns to no...

Страница 24: ...be less than 500VDC 2 I If the PV voltage is much less than 500VDC e g 430V measure the DCV by multi meter compare the readings on meter and LCD If the readings differ by 5 contact your inverter serv...

Страница 25: ...utput Operational voltage 190VAC to 270VAC Operational frequency 47 53 Hz 57 63 Hz auto selection Current distortion 3 Power factor 0 99 The Maximum Grid Impedance Applicable NA NA NA NA 0 283 0 24 j0...