Clenergy SPH Installation and Operation Manual
Step1: Mount SPH inverter to the wall or other vertical
surface
1.
Select a solid wall or vertical surface to mount the unit. The mounting
surface must have sufficient strength to carry the weight of the unit (Given
in the specification). In areas of seismic activity, additional support or
restraint may be necessary. It is recommended that the inverter is installed
at a height that provides comfortable viewing and operation of the display
and controls.
2.
There must be at least 25cm clear space above and below the unit. This is
to allow for proper air circulation and convection cooling.
3.
Mark the 4 mounting hole positions required using the mounting backplate
as a template.
SPH15
SPH20
SPH30
SPH40
SPH50
SPH60
W (mm)
312
312
312
465
465
H (mm)
362
362
362
386
516
D (mm)
131
131
141
131
142
4.
Select appropriate mounting hardware for the type of mounting surface and
drill mounting holes of the appropriate size.
5.
Fix the mounting backplate to the mounting surface using the selected
hardware at each of the 4 mounting holes.
6.
Fix four screws with spacer on the four corners of the mounting back plate.
7.
Hang the inverter unit onto the mounting back plate and press down.