background image

Page  8 of 15

 

5.2   Maintenance cycles 

Maintenance 
cycles for 
steel shot 
(working 
hours) 

 

Risk of wear! 
Demolition of equipment. 

max. 8h 

Nozzles and blast head. 

Check and replace if necessary sealing of 

nozzles and blast head. 

max. 16h 

Plastic sealing. 

Check and replace if necessary. 

Carbide insert head. 

Check and replace if necessary. 

Shaft and felt seal. 

Check and replace if necessary. 
Shaft seal position: open side to back! 

max. 30h 

Ball bearings. 

Check and replace if necessary. 

max. 50h 

Moisture separator. 

Clean only with soap and warm water. 

Air and blast hoses. 

Gaskets of couplings for wear. Blast hose 

by hand for soft spots. 

Blast pot. 

Pop up valve for wear by hand. 

max. 300h 

Air motor. 

Maintenance by Clemco or service man of 

producer. 

 

5.3  After other periods of time 

Article 

replace (even without wear) after maximal 

Blast hoses 

6 years 

Remote control hoses 

6 years 

Air hoses – external air supply 

6 years 

O-rings 

5 years 

Pop up valve (blast pot) 

5 years 

Gaskets 

5 years 

 
 
 

6  Troubleshooting 

Problem

 

Probable cause

 

Remedy

 

Blast head 
does not turn or 
too slowly 

1. Volume or pressure of air at motor is 

too less. 

Increase volume/ pressure of air for air 
motor. 

2 Leakage/ bend in supply hose of air 

motor. 

Replace or place straight. 

3. Width/ length of supply hose unsuitable.  Width of hose 6mm: max. 10m 

Width of hose 9mm: max. 20m 

4. Entered dust interlocks axle. 

Felt seal/ shaft seal/ ball bearing wear 

 

replace 

Irregular blast 
result. 

1. Pulsing blast media. 

Reduce metering. 

2. Moist blast media. 

Replace blast media with dry one. 

Vibrations. 

1. One nozzle blocked. 

Eliminate blockage. 

2. Different sizes of nozzles. 

Use equal nozzles (length and diameter). 

3. Fixture wheels loose. 

Tighten screws. 

 
 
 

7  Admitted modifications for users 

Only with the improvement of the producer! Otherwise the installation will loose guarantee and CE-
certification  
 

Содержание Spin - XL

Страница 1: ...W N E R S M A N U A L Spin XL with pneumatic driven blast head 24407D Clemco International GmbH Carl Zeiss Stra e 21 Tel 49 0 8062 9008 0 83052 Bruckm hl Mail info clemco de Germany Web www clemco int...

Страница 2: ...KING MATERIAL 6 3 2 1 Elimination recycling disposal of equipment 6 3 3 STORAGE 6 3 4 SET UP FOR INITIAL INSTALLATION OPERATION 6 4 INSTRUCTION HANDBOOK 7 4 1 OPERATION 7 4 1 1 Standard operation 7 4...

Страница 3: ...njury Discharge completely pressure during maintenance jobs Recycling Garbage Change within Europe Complete blast protective clothing Whipping hose Hold tight end of hose X m 10 x P bar X Dangerous ar...

Страница 4: ...s see table 1 Table 1 for inner diameter mm nozzle Size of blast media Min air volume m min 400 700 8 0 400 800 10 0 353 CFM 700 1500 9 5 400 800 1200 15 0 530 CFM 2 2 No conventional utilisation Warn...

Страница 5: ...tion of air motor Air service unit at blast pot 3 6 max 7bar ON OFF at remote control handle Pressure regulation of blast nozzle Blast pot 4 7bar ON OFF with slide valve at remote control handle Meter...

Страница 6: ...to pipe diameter See also chapter 8 table 2 Risk of whipping hose Mortal danger Interlock coupling A2 Connect Spin XL with blast hose and pot Connection for exhaust air supply air A3 Connect air motor...

Страница 7: ...rotective clothing cloves A2 Position Spin XL A3 Switch on First air of air motor Than air of blast pot At last blast media A4 Pull back Spin XL According to request of degree of purifica tion A5 Swit...

Страница 8: ...ximal Blast hoses 6 years Remote control hoses 6 years Air hoses external air supply 6 years O rings 5 years Pop up valve blast pot 5 years Gaskets 5 years 6 Troubleshooting Problem Probable cause Rem...

Страница 9: ...Page 9 of 15 8 Replacement parts 46 9 45 1 5 4 2 3 13 7 8 6 10 19 11 12 22 47 1 33 14 15 30 16 17 18 20 9 21 23 16 27 28 29 31 32 41 18 26 25 40 38 22 37 36 35 39 42 43 44 34 24...

Страница 10: ...24428D Deckel Antrieb Cap 14 24413D Mantelrohr Casing tube 15 90155D Zylinderkopfschraube M6x18 Hexagon bolt M6x18 16 24414D Kugellager Ball bearing 17 24415D Mantelrohr Einsatz Casing tube insert 18...

Страница 11: ...er of pipe mm Extension noz zles Kind of nozzle Length of rod for frame mm Spin XL carriage 400 580 15 5 23 Short nozzle with NW25 160 400 580 24443D Spin XL carriage extensions 580 800 22 5 31 5 Long...

Страница 12: ...Page 12 of 15 10 Appendixes 10 1 Manual for air motor type MRD stall proof oil free...

Страница 13: ...Page 13 of 15...

Страница 14: ...Page 14 of 15...

Страница 15: ...Page 15 of 15...

Отзывы: