Page 6 of 15
3 Set-up and operation
3.1 Transport
Weight
app. 40kg
Protect from beats
Observe instruction of complete system
3.2 Unpacking and dispose of packing material
Recycling
Garbage
Change within Europe
3.2.1 Elimination, recycling, disposal of equipment
Disassemble equipment and
separate for materials
3.3 Storage
Storage in dry area
Observe instruction of complete system
3.4 Set-up for initial installation/ operation
A1
Adjust carriage to pipe diameter
See also chapter 8, table 2.
Risk of whipping hose!
Mortal danger!
Interlock coupling.
A2
Connect Spin XL with blast hose and pot.
Connection for
exhaust air
supply air
A3
Connect air motor with green air hose and
upstream air service unit.
A4
Position Spin XL in pipe.
A5
Function test without blast media.
A6
Set air motor under pressure.
Blast head turns.
A7
Adjust pressure of air motor (6bar at mo-
tor
app. 90min
-1
)
max. 7bar
at motor
(attend pressure drop
of long hoses!)
A8
Activate blast pot.
Air comes out at nozzle.
A9
Function test with blast media.
Risk of escaping blast media.
Mortal danger!
Wear blast helmet, protective clothing,
gloves.
Содержание Spin - XL
Страница 12: ...Page 12 of 15 10 Appendixes 10 1 Manual for air motor type MRD stall proof oil free...
Страница 13: ...Page 13 of 15...
Страница 14: ...Page 14 of 15...
Страница 15: ...Page 15 of 15...