16
5 Maintenance
5.1 General
During operation the cabinets are exposed to wear. In order to ensure safe operation and high efficiency the
blast machines should be maintained according to the following check lists. The following check list was
made for a 6 hour full operation.
Prior to maintenance, make sure that the air valve of the compressor is
closed and the whole system is depressurized!
5.2 Daily Check List
(1) View Window.
−
Check cover lenses for frosting.
−
Replace window glass if it is damaged.
(2) Cyclone.
−
Clean screen when motor is switched off (several times a day for
huge amounts of debris).
−
Clean screen magnet.
(3) Dust container.
Empty dust container (several times a day for huge amounts of dust).
5.3 Weekly Check List
(1) blast gun and nozzle
Check nozzle gasket and replace if needed
(2) Moisture separator.
Remove and check the filter element. If necessary clean filter and sight
glass with soap and warm water and dry it with compressed air. (Im-
portant - Use only smooth detergent)
A dirty filter causes loss of pressure in the system!
(2) Air hoses and blast hoses.
−
Check all couplings and screws for wear or breakage and replace
them if necessary.
−
Check the blast hose by hand for soft spots (reduced wall thickness)
and replace it
immediately
when soft spots are detected.
−
Check air line (air supply) and replace it when it is worn.
−
Check gaskets of couplings for wear and replace them if necessary.
5.4 Monthly Check List
(1) Cabinet door gasket.
Check for leaks and wear. Replace if necessary
(2) Gloves.
Check gloves for wear. When using aggressive blast media usually more
checks are necessary.
(3) Cartridge.
The cartridge should be checked or replaced every three months.
Содержание Pulsar II
Страница 20: ...20 7 Replacement parts 7 1 Individual replacement parts for cabinet ...
Страница 21: ...21 ...
Страница 22: ...22 Picture 5 Individual parts cabinet ...
Страница 28: ...28 8 Cabinet wiring 400V 0 55kW ...
Страница 29: ...29 ...