background image

 

MAINTENANCE 

GIAMPY

 

 

Rev. 00 

15/02/2012 

Pag. 38/43

 

 

 
 

5.3  ELECTRICAL EQUIPMENT CHECKING 

 

The electrical system must be checked every two years. Possible defects, such as connections off and burnt 
cables, must be suddenly replaced. 
 
 

 

All intervention on the electrical system must be done by a technician. 
All  maintenance  or  repair  out  of  the  ordinary  maintenance  must  be  done  with  personnel 
authorized only by FIORENTINI. 

 
 

5.5    TABLE ABOUT TESTS TO BE CARRIED OUT 

 

 
 

RECURRENCE 

OPERATOR 

 
           CONTROLS 

 
 

 

 

SAFETY DISPOSITIVES 

 

2 YEARS 

 

PROFESSIONAL TECHNICIAN 

 

ELECTRICAL SYSTEM 

 

2 YEARS 

 

FIORENTINI TECHNICIAN 

 

BRAKING SYSTEM 

 

3 MONTHS 

 

PROFESSIONAL TECHNICIAN 

 

COMPLETE CHECKUP 

 

5 YEARS 

 

FIORENTINI TECHNICIAN 

 
         MAINTENANCE 

 
        

 

 

RECOVERY TANK CLEANING 

 

DAILY 

 

OPERATOR 

 

SUCTION MOTOR FILTER 

 

DAILY 

 

OPERATOR 

 

SOLUTION TANK FILTER 

 

MONTHLY 

 

OPERATOR 

 

SUCTION PIPES CLEANING 

 

WEEKLY 

 

OPERATOR 

 

SQUEEGEE CLEANING 

 

WEEKLY 

 

OPERATOR 

 

BLADES LEVEL CONTROL 

 

WEEKLY 

 

OPERATOR 

 

WATER BATTERY LEVEL 

 

WEEKLY 

 

OPERATOR 

 

BATTERY CABLES CONTROL 

 

6 MONTHS 

 

PROFESSIONAL TECHNICIAN 

 

MOTOR BRUSHES CONTROL 

 

EVERY YEAR 

 

PROFESSIONAL TECHNICIAN 

 
 
 
 
 
 
 
 
 
 
 

Содержание 50B

Страница 1: ...0B SCRUBBER DRYER OPERATOR MANUAL Clemas Co Unit 5 Ashchurch Business Centre Alexandra Way Tewkesbury Gloucestershire GL20 8NB Tel 01684 850777 Fax 01684 850707 Email info clemas co uk Web www clemas...

Страница 2: ...20 20 20 4 2 Storage 21 21 21 21 4 3 Instructions to un pack the machine 21 21 21 21 4 4 Handle the unpacked machine 21 21 21 21 4 5 Installation 22 22 22 22 4 5 1 Batteries installation 22 22 22 22...

Страница 3: ...CE MAINTENANCE MAINTENANCE 35 35 35 35 5 1 Maintenance tabel 35 35 35 35 5 2 Battery maintenance 36 36 36 36 5 2 1 Hydrometry 3 3 3 36 6 6 6 5 2 2 Water filling up 3 3 3 36 6 6 6 5 2 3 Charging limits...

Страница 4: ...FIORENTINI Co in writing or by phone just after a attentive analysis of fault and of causes so that it would be necessary to report to the agent the following data Machine model get from the relative...

Страница 5: ...GENERAL INFORMATION GIAMPY Rev 00 15 02 2012 Pag 7 43...

Страница 6: ...GENERAL INFORMATION GIAMPY Rev 00 15 02 2012 Pag 8 43...

Страница 7: ...e power supply is furnished of a series of accumulator batteries that charge all the engines and the electrical controls The machine depending on the model can be supplied with one or two rotating bru...

Страница 8: ...plastic PE HD complete with piping flexible system of suction and drainage a set of batteries placed in the recovery tank space rotating brushes suction system squeegee one free caster wheel two trac...

Страница 9: ...ISTICS VOLTAGE 220 230 V BRUSH GEARMOTOR N 1 x 230V 550W TRACTION MOTOR N 1 x 24V 130W SUCTION MOTOR N 1 x 230V 350W FUNCTIONAL CHARACTERISTICS SQUEEGEE LIFT CONTROL LEVER VACUUM CONTROL SWITCH BRUSH...

Страница 10: ...VOLTAGE 24 V BRUSH GEARMOTOR N 1 x 24V 400 W N 1 x 24V 850 W TRACTION MOTOR N 1 x 24V 130W SUCTION MOTOR 24 V 550 W FUNCTIONAL CHARACTERISTICS SQUEEGEE LIFT CONTROL LEVER VACUUM CONTROL SWITCH BRUSH L...

Страница 11: ...Y22 1 GIAMPY22 2 LENGHT 1350 mm 1300 mm WIDTH 595 mm 815 mm HIGHT 1040 mm SCRUBBING BRUSHES N 1 x 550 mm N 2 x 285 mm SCRUBBING WIDTH 550 mm 550 mm SQUEEGEE WIDTH 750 mm DRIVE WALK BEHIND SOLUTION TAN...

Страница 12: ...ERISTICS GIAMPY22 CILIN BRUSHES LENGHT 1180 mm WIDTH 810 mm HIGHT 1080 mm SCRUBBING BRUSHES N 2 cylindrical brushes 110 mm L 500 mm SCRUBBING WIDTH 500 mm SQUEEGEE WIDTH 750 mm DRIVE WALK BEHIND SOLUT...

Страница 13: ...n places with no suction or with good ventilationi No respect of safety rules from the operators Any modification that can modify the correct machine function Any modification not authorized by Fioren...

Страница 14: ...that it concerns safety aspects particularly operators must read and understand this manual FIORENTINI decline every responsibility for accidents to persons or things from using the machine by non aut...

Страница 15: ...e machine to eliminate or at less to reduce accidents to operators since the projecting phase To reduce these risks we provided to inform the operators through signals and showing means and procedures...

Страница 16: ...Signals are circular shaped with black colored in white field red crossed pictograms In case of wear and tear the purchaser must re establish similar signals of danger It s absolutely forbidden to ke...

Страница 17: ...ual overturning of the battery protection What to do During the battery charging please check that the locking lever of the recovery tank is duly hooked What is it This signal shows explosion dangers...

Страница 18: ...bands At the moment of delivery we suggest to check the machine about accidental damages while transported and about have received all material indicated in coverings in case of damages or missing pa...

Страница 19: ...erfect conservation and efficiency of its body parts Humidity must be lesser than 80 and storage temperature between 3 C t 45 C 4 3 INSTRUCTIONS TO UNPACK THE MACHINE Cut off the bands being careful o...

Страница 20: ...dling is made easier by handles on both sides 4 5 2 CHARGER INSTALLATION The battery charging must be done as previously reminded predisposing a suitable suction system of gases coming out during char...

Страница 21: ...he battery charger To reach it you have to remove the screws which are fixing the cover to the electric system and take it away Characteristics of the CHARGER 24V 12A HIGH FREQUENCY GEL ACID PICTURE N...

Страница 22: ...that start stop every function of the machine Every interrupters has a pictogram showing without errors related functions In picture 4 6 is showed the control bridge while the schedule shows every sw...

Страница 23: ...p every function of the machine Every interrupters has a pictogram showing without errors related functions In picture 4 6 1 is showed the control bridge while the schedule shows every switch function...

Страница 24: ...arting switch for brushes motor pulling down the brushes with the pedal and actionning the lever of water regulation Water dosage must wet all the surface A single scrubbing action involves to put dow...

Страница 25: ...ty of 50 cc inside the recovery tank before scrubbing Be sure that detergent is suitable for the surface to clean up Fiorentini S r l is not responsible for damages caused by detergents too aggressive...

Страница 26: ...icture 4 9 Pulling up this one and putting it to its place is possible to control the squeegee Water floating regulation particular 3 picture 4 9 Pulling up or down the lever to get a good regulation...

Страница 27: ...e squeegee is perfectly regulated This squeegee is well done to pick up the water to the suction pipe but is too sensitive face to the ground level To regulate the squeegee is necessary Remove the ign...

Страница 28: ...e 4 13 suction pipe particular 2 picture 4 12 Moreover the machine is complete with a flexible pipe detail 3 picture 4 13 which sucks the dirty water and a porthole cleaning inspection of the tank sol...

Страница 29: ...ate then pushing it on detail 1 picture 4 14 Two brushes version To substitute the brushes do as it follows Remove the ignition key to avoid casual startings Remove the protection pulling it out parti...

Страница 30: ...ange detail 4 in picture nr 4 18 By means of a slight pressure upwards set the new brush up Set the brushes cases up again after having replaced the brushes To proceed to clean the waste tray must ope...

Страница 31: ...nd replace the brushes belt Tighten the nut so that the brushes belt has the same strenght as before Set the brushes case up again by means of the four screws 4 7 9 SQUEEGEE BLADES REPLACEMENT The squ...

Страница 32: ...TION When the machine is scrubbing it is possible to adjust the brush height from the ground in order to vary its pressure on the floor Rotating the knob anti clockwise particular 1 fig 4 22 the press...

Страница 33: ...nd squeegee pipes cleaning up Weekly Controls Check the state of the suction blades and of the squeegee rubber Check battery water level Every 15 days Check solution tank filter Every month Check brak...

Страница 34: ...olyte temperature goes up of 10 12 C inside facing to ro om temperature it can be overcharged without depending from the normal use 5 2 4 OFF DUTY OR INACTIVE BATTERIES While inactive the batteries ca...

Страница 35: ...ns eeeping away the key from the dashboard release the motor hooks and disconnect the plug epty the recovery tank lifting up the recovery tank detail 1picture 5 1 unscrew the screws holding the cover...

Страница 36: ...S TO BE CARRIED OUT RECURRENCE OPERATOR CONTROLS SAFETY DISPOSITIVES 2 YEARS PROFESSIONAL TECHNICIAN ELECTRICAL SYSTEM 2 YEARS FIORENTINI TECHNICIAN BRAKING SYSTEM 3 MONTHS PROFESSIONAL TECHNICIAN COM...

Отзывы: