750-136
Model WB Electric Boiler Manual
2-1
CHAPTER 2
Installation Instructions
2.1 — Receiving Inspection
Every Model WB boiler is completely inspected at the factory and carefully crated for shipment. Inspect the pack-
ing for signs of exterior damage. After placing the unit as close as possible to the point of actual installation,
uncrate carefully and check all boxes and cartons against the packing slip. In case of damage or shortage, notify
the carrier immediately.
2.2 — Location
Consult local codes for specific requirements. Refer to the Dimensional Drawings (DD) and Wiring Diagrams
(WD) prepared by Cleaver-Brooks for your specific installation. Position the boiler to provide adequate clearance
on all sides for necessary access when operating and servicing the boiler.
Installation should be performed only by qualified personnel who are familiar with this equipment. Failure to heed
this warning may result in serious personal injury or death.
Before proceeding, make sure you read and understand the contents of this manual. Failure to do so may result in
serious personal injury or death.
To avoid damage to the equipment, be sure to:
1. Check your local electrical code for minimum clearances required around electrical equipment.
2. For installation in a closet, provide ventilation openings of 200 square inches per 100KW of boiler rating.
3. Observe local codes, which may specify greater clearances over top of boiler and must take precedent.
4. Install indoors only.
!
Warning
!
Caution
Содержание WB
Страница 1: ...Table Of Contents Model WB Electric Boilers Hot Water Operation and Maintenance Manual 750 136 07 2018...
Страница 2: ......
Страница 6: ......
Страница 12: ...General Description 1 6 750 136 Model WB Electric Boiler Manual...
Страница 18: ...Installation Instructions 2 6 750 136 Model WB Electric Boiler Manual...
Страница 35: ......
Страница 36: ......