![CleaverBrooks 4WI Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/cleaverbrooks/4wi/4wi_operation-service-and-parts-manual_2622058031.webp)
750-211 (revised 2009)
Promethean Boilers, Model 4WI Manual
2-7
2.5 — Controls for Gas Firing
FIGURE 2-7.
Burner Drawer Face and Gas Modulating Cam
8. Main Gas Vent Valve
A normally open solenoid valve installed between the two main gas valves to vent
gas to the atmosphere should any be present in the main gas line when the gas
valves are de-energized. The vent valve closes when the gas valves are energized.
9. Low Gas Pressure Switch
A pressure actuated switch that is closed whenever main gas line pressure is above a
preselected pressure. Should the pressure drop below the setting, the switch con-
tacts open a circuit causing the main gas valve(s) to close, or prevent the burner
from starting. The switch is usually equipped with a device that must be manually
reset after being tripped.
10. High Gas Pressure Switch
A pressure actuated switch that is closed whenever main gas line pressure is below a
preselected pressure. Should the pressure rise above the setting, the switch contacts
will open a circuit causing the main gas valve(s) to close, or prevent the burner from
starting. The switch is usually equipped with a device that must be manually reset
after being tripped.
11. Gas Pilot Aspirator
Provides complete mixing of gas and air to the pilot.
12. Gas Pilot Adjusting Cock
Regulates the size of the gas pilot flame.
13. Gas Modulating Cam
As assembly consisting of a quadrant, a series of adjustable allen-head screws, and a
contour spring. Provided for adjustment of gas input at any point in the modulating
range.
14. Butterfly Gas Valve
The pivoted disc in the valve is actuated by connecting linkage from the gas modu-
lating cam to regulate the rate of gas flow to the burner.
15. Leakage Connection
The body of the gas valve has a plugged opening that is used whenever it is neces-
sary to conduct a test for possible leakage across the closed valve.
Component/Control
Description
Содержание 4WI
Страница 46: ...Burner Operation and Control 2 22 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 62: ...Waterside Care and Requirements 3 16 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 70: ...Sequence of Operation 4 8 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 114: ...Adjustment Procedures 6 28 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 192: ...Parts 9 38 750 211 revised 2009 Promethean Boilers Model 4WI Manual 9 2 27 General Control Panel 60 106 100 800 HP...
Страница 196: ...Parts 9 42 750 211 revised 2009 Promethean Boilers Model 4WI Manual 9 2 29 Main Gas Train 60 106 100 800 HP...