Parts
9-2
750-211 (revised 2009)
Promethean Boilers, Model 4WI Manual
9.2 — Parts
9.2.1 — Front Door Insulated Head
BOILER DIA
PPM RATE
FRONT HEAD ASSEMBLY
132-02338
30
60"
LH
132-02337
RH
LH
RH
132-02427
132-02426
60
RH
LH
RH
LH
132-02430
132-02431
132-02417
132-02418
30
60
67"
132-02411
132-02410
132-02308
132-02307
132-02390
132-02391
132-02403
132-02404
85"
78"
60
30
30
60
LH
RH
LH
RH
RH
LH
RH
LH
RH
LH
RH
RH
LH
RH
LH
LH
132-02408
132-02407
132-02398
132-02397
132-02428
132-02429
132-02315
132-02316
60
30
60
30
106"
96"
Содержание 4WI
Страница 46: ...Burner Operation and Control 2 22 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 62: ...Waterside Care and Requirements 3 16 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 70: ...Sequence of Operation 4 8 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 114: ...Adjustment Procedures 6 28 750 211 revised 2009 Promethean Boilers Model 4WI Manual...
Страница 192: ...Parts 9 38 750 211 revised 2009 Promethean Boilers Model 4WI Manual 9 2 27 General Control Panel 60 106 100 800 HP...
Страница 196: ...Parts 9 42 750 211 revised 2009 Promethean Boilers Model 4WI Manual 9 2 29 Main Gas Train 60 106 100 800 HP...