background image

 14  |  User Guide

OPERATING INSTRUCTIONS

1. Power Up

  Plug in the controller. The digital display will turn on. 

2. Program 

 

Press the “Ion/Action” button to set the ion cycle time. 

Follow the guidelines below based on the gallons or 

liters you are ionizing. 

3. Optional 

Press the “Large Dose” button to set the hours of large 

dose. You may set from 1 to 99 hours. Follow the 

guidelines below. When the large dose cycle is finished 

it will return to the previously set Ion/Action setting.

Model A-400 (Maximum 2,500 gal / 9,500 L)

Please note these are general guidelines only. You will need to adjust 

the levels based on your copper test kit readings.  See the maintenance 

section for more information.

It will take approximately 2 days to attain the minimum copper residual 

of 0.2ppm and 5 days to attain the copper residual of 0.6ppm in the 

maximum spa volume stated above.

Liters

Gallons

Ion/Action

Large Dose

750

200

11

11

1,500

400

19

21

1,900

500

24

27

3,800

1,000

35

37

5,700

1,500

53

55

7,550

2,000

72

75

9,500

2,500

90

95

Содержание CLEAR A-400

Страница 1: ...CLEAR State of the Art Water Management 1 U S E R G U I D E...

Страница 2: ...vels over 1ppm and a pH reading over 7 8 may cause copper to precipitate READ THE LABEL AND THE INSTALLATION AND OPERATION MANUAL BEFORE USING KEEP OUT OF REACH OF CHILDREN 18800 Woodinville Snohomish...

Страница 3: ...ld be maintained to break down organics sweat hair urine make up sunscreen etc 5 Keep your ion level between 0 2ppm 0 6ppm Test your water with the Copper Test Kit periodically to ensure ion level is...

Страница 4: ...Guide 8 Grounding Instructions 10 Installation Instructions 10 The Digital Display 12 Operating Instructions 14 Maintenance 15 Cleaning Care 17 Warranty 18 Specifications 19 Replacement Parts Accessor...

Страница 5: ...not operate this system if it has a damaged cord or plug Do not immerse cord or plug in water Keep cord away from heated surfaces Heavy bather loads may trigger the need for additional chlorine bromi...

Страница 6: ...e We can t say this is a chemical free system BUT the only time you need sanitizer in your water is when bacteria is present STAGE 1 Copper Silver Ionization System This helps dramatically reduce the...

Страница 7: ...r to the jets on high speed We at Clearwater Spas believes it s more important to dedicate a pump to 24 7 water filtration Every Clearwater Spa includes a 24 7 circulation pump STAGE 2 Magnetic Field...

Страница 8: ...copper level Set the Ion Action and Large Dose values according to the operating manual Set the Ion Action first then set the Large Dose When the Large Dose expires test the water with the copper test...

Страница 9: ...k yourlevels weekly THIRD VISIT every week 1 Check the pH and TA using the provided four in one test strips Once your levels are set correctly continue to check your levels weekly 2 Check the copper l...

Страница 10: ...equipment or personal injury resulting from failure to observe the correct electrical connection procedures INSTALLATION INSTRUCTIONS CLEAR can be installed in under 30 minutes The PVC tee is usually...

Страница 11: ...rface 9 Connect cable from mineral cell into the controller 10 Use your hand to turn the cell clockwise into the tee until it is secure To ensure even wearing of electrodes tighten the cell so that so...

Страница 12: ...Large Dose Press this button to release the maximum amount of ions for the number of hours you choose The display will count down the number of hours left The system will return to the previously set...

Страница 13: ...blue and the flashing will stop To stop the Large Dose mode before the cycle finishes hold down the button in the center of the logo for 10 seconds Turn Off Ionizing If the mineral level is too high o...

Страница 14: ...s finished it will return to the previously set Ion Action setting Model A 400 Maximum 2 500 gal 9 500 L Please note these are general guidelines only You will need to adjust the levels based on your...

Страница 15: ...hat water flows between them 3 You will need to oxidize the water to break down excess organic matter i e sweat urine makeup suntan oils Chlorine or bromine tablets are recommended over liquid shock a...

Страница 16: ...not a dangerous chemical and it is used in small quantities Please follow the directions on the product label Note Stain and Scale or sequestering products conflict with CLEAR If you use a stain and s...

Страница 17: ...s of oxidization and other sediments System Controller Exterior Housing The housing of the controller is made from a durable PVC plastic Clean the outside with a mild soap and water rinse and dry with...

Страница 18: ...a claim This warranty is in effect starting the date of purchase and is only applicable to units with an unopened enclosure and a serial number that is in its original unaltered state This warranty do...

Страница 19: ...variable settings Tee 2 Slip x 2 Slip x 1 Fipt S40 PVC Tee Mineral Cell Size 3 x x 5 16 Each x 2 Bars Mineral Cell Weight 8 ounces Typical Mineral Cell Life 2 years Capacity Max 2 500 REPLACEMENT PART...

Страница 20: ......

Отзывы: