background image

Visit 

www.ClearSpan.com

 for additional products and customer assistance.

CLEARSPAN

 DOME TENTS

2

YOU MUST READ THIS DOCUMENT BEFORE YOU  

BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this ClearSpan™ SunBurst 

shelter. When properly assembled and maintained, this 

product will provide years of reliable service. These 

instructions include helpful hints and important information 

needed to safely assemble and properly maintain the 

shelter. Please read these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service for assistance.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal tubes.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the shelter or framing during or after  

construction.

•  Do not occupy the shelter during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the shelter.
•  Provide proper ingress and egress to prevent  

entrapment.

ANCHORING INSTRUCTIONS

Prior to assembling this shelter, please read the 

MUST 

READ

 document included with the shipment. 

 WARNING:

 The anchor assembly is an integral part of 

the shelter construction. Improper anchoring may  

cause shelter instability and failure of the structure. 

Failing to anchor the shelter properly 

will void the 

manufacturer’s warranty

 and may cause serious injury 

and damage.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the shelter where large loads such as 

snow and ice, large tree branches, or other overhead 

obstacles could fall.

SITE

After choosing a location, proper preparation of the site is 

essential. Follow the information below.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  For sites that are not concrete or gravel, placing wood  

blocks or other suitable supports under each rafter leg 

helps prevent the pipes from sinking or working into the 

site.

• 

Drainage: Water draining off the structure and from 

 

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

 WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques must seek the help of a qualified  

contractor.

Содержание SunBurst

Страница 1: ...earSpan All Rights Reserved Reproduction is prohibited without permission Revision date April 2007ldg ClearSpan SunBurst Dome Tents STK DIMENSIONS 106612 10 W x 10 L Photo may show a different but similar model ...

Страница 2: ...r properly will void the manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes a...

Страница 3: ... with the shipment To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of...

Страница 4: ...S The following steps will ensure that you have all the necessary parts before you begin to assemble the shelter 1 Unpack the contents of the shipment and place where you can easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult the Quick Start Guide ...

Страница 5: ...stration below helps identify the main parts of the shelter frame Length and design may vary 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and roof frame and attach the legs 3 Square the frame and anchor as instructed 4 Prepare and attach side panels if equipped and attach main cover 103933 3 Way Corner Coupler 103930 4 Way Crown Fitting Tent Leg Hip Rafter Base Ra...

Страница 6: ...ts NOTE Secure the completed pipe assemblies to the corner couplers using the 1 4 bolts and nuts 3 Using the Front Profile diagram in the Quick Start section assemble the four 4 base rafter pipes Each base rafter is assembled using one 1 51 plain pipe 131P051D and one 1 63 swaged pipe 131S063D 4 Take the corner couplers and the assembled base rafter pipes and construct the roof frame of the tent 5...

Страница 7: ...ation steps NOTE Like the main cover the optional side panels are attached to the frame using the snugger balls CC4595 in the manner illustrated Do not install panels without first anchoring the assembled frame Continue with these steps to attach the side panels 1 Unpack panels and unfold completely 2 After anchoring the frame lift the panel into position place the snugger balls through the gromme...

Страница 8: ...ading the care and maintenance information that follows SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Regularly check the main cover and side panels if equipped to see that these remain tight and in proper repair Check connections and all fasteners including the snugger balls to verify ...

Страница 9: ...9 CLEARSPAN DOME TENTS Visit www ClearSpan com for additional products and customer assistance QUICK START GUIDE 10 Wide SunBurst Dome Tent Frame shown may vary in length from actual frame ...

Страница 10: ...w ClearSpan com for additional products and customer assistance CLEARSPAN DOME TENTS 10 FRONT PROFILE 131S063D 131P051D 131P090D 131S063D 131S063D 131P021D 131P021D 131P090D Corners 103933 Corners 103933 103930 ...

Страница 11: ...11 CLEARSPAN DOME TENTS Visit www ClearSpan com for additional products and customer assistance CONNECTIONS Rafter Corner Connection View 1 Rafter Crown Connection View 2 ...

Страница 12: ...l products and customer assistance CLEARSPAN DOME TENTS 12 CONNECTION DETAILS Base Rafter Hip Rafter 103933 3 Way Corner Tent Fitting Leg Hip Rafter 103930 4 Way Crown Fitting View 1 Rafter Corner Connection View 2 Rafter Crown Connection ...

Страница 13: ...13 CLEARSPAN DOME TENTS Visit www ClearSpan com for additional products and customer assistance Space below is reserved for customer notes ...

Отзывы: