ASSEMBLING THE STORAGE MASTER BUILDING
COMPONENTS
NOTE
: Assistance is required to assemble the shelter.
After the site is prepared and squared, the rafter feet are
assembled and anchored in place (if applicable to your
shelter), and an inventory of parts is complete, assemble
the rafters.
RAFTER ASSEMBLY
Gather the parts:
• Rafter pipe (#20SM23P2)
• Rafter pipe (#20SM23S1) & Rafter pipe (#2375S124D)
• Pipe 1.66'' x 99'' swaged (#166S099)
• Pipe 1.66'' x 40'' plain (#166P040)
• Band clamps (#QH1402 & 103856)
• Pipe strap (#QH1070)
• Tek screws (#FA4482)
Each rafter assembly consists of five (5) rafter sections:
1 curved center pipe (for the top or peak), 2 leg pipes that
include
drilled holes near the bottom
to connect the rafter
feet, and 2 curved pipes that connect the legs to the top
center pipe.
Interior Rafter Assembly Procedure
1. Select the five (5) pipes needed to assemble a rafter
and arrange these on a flat surface as shown below for
assembly.
NOTE:
DO NOT
connect the sections at this time.
(#20SM23S1)
(#20SM23P2)
(#2375S124D)
2. Take five (5) of the larger band clamps (#103856) and
slide these onto the different rafter pipes and position
them near the marked locations. See circles below.
Do
not secure these clamps at this time
.
Clamps are repositioned in a later step.
3. Slide the swaged portion of each rafter pipe into the
plain end of the adjacent pipe.
Pre-drilled hole direction.
IMPORTANT:
The rafter foot mounting holes drilled in
the sides near the bottom of each rafter leg must be
parallel with the ground
when viewed looking down at
the rafter assembly on the ground.
Band clamp locations may differ from actual locations.
B
C
A
B
A
C