FINISH ROUGH EDGES

Gather the parts:
•  Duct tape (supplied by customer)
•  Metal file
1.  Check for any sharp edges on the frame and file them 

smooth so they will not cut the cover.

2.  Apply two layers of heavy duct tape on all pipe  

connections and clamps that may contact the cover.

3.  Tape all rafter splices with duct tape to protect the main 

cover when it is installed.

4.  Verify that all pipe splices and clamps are secured 

using Tek screws. 

5.  Continue by installing the pivot wheel assemblies.

INSTALL PIVOT WHEEL ASSEMBLY

When the wheel pivot wheel assembly is properly installed 

and locked in the down position, the frame assembly will be 

off the ground.
1.  Place a wheel assembly on the ground next to each 

end rafter. (See the Quick Start Guide in back of 

instruction for proper locations.) 

2.  Take one wheel assembly and position it on the 

mounting board a few inches in from the end rafter. 

 

NOTE:

 The actual pivot wheel assembly may be 

different from what is shown.

3.  Center the assembly, mark the mounting holes on the 

mounting board, and drill the holes. 

4.  Attach the wheel assemblies to the mounting board on 

the inside of the frame as shown. 

 

NOTE:

 If the mounting bolts are too long, use a small 

section of waste mounting board as a spacer, or 

replace the bolts with fasteners purchased locally.

5.  Repeat these steps for remaining wheel assemblies.  

 

NOTE:

 All wheel assemblies must be level and 

attached at the same height. Space wheels in positions 

that will best support the frame when it is moved.

Inside View

Outside View

Pivot wheel 

as seen on 

the inside of 

the frame.

Содержание PB00556R3S

Страница 1: ...6 11 08 ClearSpan Portable Freestanding Building Diagram may show a different but similar model 2008 ClearSpan All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS PB00556R3S 12 W x 10 H x 24 L PB00556R4S 12 W x 10 H x 24 L ...

Страница 2: ...nd precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structure Location should be away from structures that could cause snow to drift on or around the building Do not position the shelter where large loads such as sno...

Страница 3: ...the shipment To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the f...

Страница 4: ...ame and provides a mounting surface for the pivoting wheel jacks This board is required The mounting board material and fasteners needed to secure the board to the frame are not included with the shipment and must be supplied by the customer These instructions describe using 2 x 6 lumber for the mounting board This is the minimum lumber thickness needed to safely and properly secure the pivoting w...

Страница 5: ...y are used All parts are not shown QH1400 Band Clamp FA4482B Tek Screw 102855 End Clamp 102479 Cross Connector QH1061 Ratchet 102947 D ring Strap 103620b Plain End Strap Swaged Unswaged Swaged and Unswaged plain Rafter Sections All parts are not shown Wheel Kit Assembly ATTENTION Actual wheel jack assembly may differ slightly in design from what is shown ...

Страница 6: ...ease see the Assembling the Round Style Portable Freestanding Building Components section Consult the diagram below to identify main parts of shelter 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame 3 Attach baseboards struts and pivoting wheel kit assemblies 4 Prepare and attach main cover NOTE Diagram shows a shelter with 4 rafter spacing Number of rafters...

Страница 7: ...tapping Tek screw Position Tek screw approximately 1 from pipe joint END RAFTER ASSEMBLY In addition to the steps in the previous procedure complete the following steps for the two end rafters only 1 Take one of the assembled rafters and place it on a flat surface 2 Slide five 5 end clamps and two 2 band clamps onto the rafter in the locations noted below Do not secure the clamps to the rafter at ...

Страница 8: ...ake sure the heads of the band clamp bolts are toward the outside of the shelter 4 Position the inside rafter from the end rafter using the on center rafter to rafter spacing for your building as shown in the chart below Another person is required to hold the rafter in position 5 Place a cross connector at the top of the inside rafter and insert a purlin pipe through the connector and through the ...

Страница 9: ...The size and type of the boards chosen may require the use of alternative steps When properly installed mounting boards run the length of the shelter on the inside of the frame 1 Measure the board height needed using the wheel assembly in the retracted position and mark the locations on the rafter legs NOTE Building frame must rest on all rafter legs when the wheel assemblies are in the retracted ...

Страница 10: ... purlin joint and secure the joint using a Tek screw if this has not been completed NOTE For some applications the lower end of each strut is attached directly to the mounting board using carriage bolts and nuts supplied by the customer View from the outside of the frame Mounting Board 90 Strut 4 Continue adding boards to complete the first run NOTE Secure all splices of the mounting board between...

Страница 11: ...1 Place a wheel assembly on the ground next to each end rafter See the Quick Start Guide in back of instruction for proper locations 2 Take one wheel assembly and position it on the mounting board a few inches in from the end rafter NOTE The actual pivot wheel assembly may be different from what is shown 3 Center the assembly mark the mounting holes on the mounting board and drill the holes 4 Atta...

Страница 12: ...over and setting it in position do not pull on the end straps They will pull out of the cover WARNING To prevent damage to the cover and to prevent serious personal injury DO NOT attempt to install the main cover on windy days 1 Fasten a ratchet to the end rafter using a Tek screw as shown below The ratchet should be as low as possible and still operate Repeat this step for the remaining corners E...

Страница 13: ...nife Assembly Procedure 1 To pull the cover over the frame attach a rope to each end of the cover conduit Wrap the rope around the conduit a few times to prevent it from slipping off NOTE Depending on the length of the cover it may be necessary to attach additional ropes to the cover conduit between the end ropes by cutting a small opening in the cover pocket and tying the rope around the conduit ...

Страница 14: ... D ring straps can be repositioned higher or lower as needed and the main cover retightened 15 Fold the skirt of main cover down and over the ratchets and D ring straps to complete the installation of the main cover 16 Read the care and maintenance information ATTACH MAIN COVER CONTINUED NOTE DO NOT cut through the main cover Cut through the conduit pocket only 11 Thread the plain strap ends into ...

Страница 15: ... shelter Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover or the side panels that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is ...

Страница 16: ...CLEARSPAN GARAGES STORAGE SHEDS 16 Revision date 06 11 08 QUICK START GUIDE 12 Wide Round Style Portable Freestanding Building Frame length and rafter spacing may differ from actual frame ...

Страница 17: ...note Strut Connection End rafters only Position determines height Strut Connection End rafters only Position determines height 12R1301 12R1301 12R1302 12R1303 131S027 131S027 Connection Note Purlin connected to end rafters using 102855 clamp See View 1 Purlin connected to mid rafters using 102479 cross connector See View 3 Pivoting Wheels Note Mounting boards supplied by customers ...

Страница 18: ...R3S R R QH1061 Ratchets secured to one side of rafters indicated with R R R R Rafter Spacing 3 0 24 0 Length 131S075 131P0735 Purlin run 131S075 131S075 MOUNTING BOARD Diagram shows the mounting board below the bottom purlin The struts can be attached to the purlin or the rafter ...

Страница 19: ... date 06 11 08 SIDE PROFILE PB00556R4S 131S075 131P0735 Purlin and cover conduit run 131S075 131S075 R 4 0 Rafter Spacing 24 0 Length R R QH1061 Ratchets secured to one side of rafters indicated with R Note No ratchets required on opposite side ...

Страница 20: ...CLEARSPAN GARAGES STORAGE SHEDS 20 Revision date 06 11 08 Purlin End Rafter Connection See View 1 Strut Connection See View 2 Purlin Mid Rafter Connection See View 3 CONNECTIONS ...

Страница 21: ...ate 06 11 08 CONNECTION DETAILS VIEW 1 PURLIN END RAFTER End Rafter Purlin VIEW 3 PURLIN MID RAFTER End Clamp Rafter Cross Connector Purlin VIEW 2 STRUT CONNECTION Rafter Strut Band Clamp Note Strut secured to bottom purlin run in similar fashion ...

Отзывы: