background image

21

CLEARSPAN

 ECONOMY MOO-TEL

Revision date: 01.26.18

FRONT PROFILE

102675

102675

End:

102856

Middle

:

102548

20R1601

20R1601

20R1601

20R1602

166S027D

166S027D

Ground Level

Содержание Moo-Tel Economy 107404

Страница 1: ...uction is prohibited without permission ClearSpan Economy Moo Tel STK DIMENSIONS 107404 20 W x 12 H x 24 L 107405 20 W x 12 H x 36 L 107406 20 W x 12 H x 48 L Photo may show a different but similar model The optional end panels additional purchase required are shown Actual building may differ ...

Страница 2: ...nufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing...

Страница 3: ...To aid in the assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly...

Страница 4: ...ation or contact Customer Service NOTE At this time you do not need to open the plastic bags containing smaller parts such as fasteners or washers if equipped SPECIAL NOTE Baseboards for Frame These instructions describe installing a baseboard recommended at ground level along each side of the frame The baseboard runs from the front to the back of the frame This baseboard is not included with the ...

Страница 5: ...w you how they are used Not all parts are shown FA4482B Tek Screw 102856 End Clamp 102548 Cross Connector Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown 102568 Mounting Plate 102569 Bearing 102717 Gearbox Drive Gearbox 102198 U Channel Spring 102197 Poly Latch U Channel 102570 Aluminum Channel 102675 Ground Post ...

Страница 6: ...an overview of the process to assemble your building For details consult the Assembling the Frame Components section See illustration below to identify main parts of building 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame and square the frame 3 Prepare and attach end panels if equipped 4 Attach main cover and Twist of the Wrist assembly Roll Up Side Condui...

Страница 7: ...g the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter The string is used to identify the tops of all remaining ground posts The string must remain tight and level 9 Use a tape measure to mark the 48 on center locations of the remaining ground posts 10 Drive the rem...

Страница 8: ... with those in ground post Install the screws so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the shelter once the frame is assembled 4 Assemble rafters as described and continue with the additional steps to complete the assembly of the two 2 end rafters END RAFTER ASSEMBLY In addition to the...

Страница 9: ...til the frame is assembled Secure all purlin splices using Tek screws See Step 10 NOTE Each purlin assembly consists of 1 315 x 75 131S075 swaged pipes number is determined by shelter length and one 1 1 315 x 73 5 131P0735 plain pipe 9 Finish each purlin run using the plain shorter pipe 131P0735 and use the final end rafter to complete the assembly NOTE If the last end rafter is plumb and the purl...

Страница 10: ...ted or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the ground posts from sinking into the ground when anchored Depending on the building it also provides a surface to attach struts or other building components SIDE STRUT INSTALLATION Side struts are positioned between the end rafters and the first interior rafter on each side of the shelte...

Страница 11: ...erious injury and damage If a baseboard is not present install another band clamp around the interior rafter leg see insert above and attach the lower end of the strut to that band clamp Rafter design shown above may differ from actual rafter and frame of your building 5 Repeat the above steps to attach the remaining side struts to the frame 6 After installing the struts verify that all band clamp...

Страница 12: ... steps to secure the other end panel to the frame using the remaining half of the fabric clips NOTE The end panels may be shipped as untrimmed rectangular pieces If so use scissors to trim the excess end panel material from inside the frame after attaching the panels to the end rafters 4 5 Ribbon Board Rafter MAIN COVER INSTALLATION After installing the end panels if equipped install the main cove...

Страница 13: ...opes long enough to reach over the frame provided by customer U Channel spring Wear eye protection Box cutter or utility knife Assembly Procedure After the poly latch U Channel is attached to the frame unpack the main cover and pull into place Ropes or straps are typically used to pull the main cover onto and over the frame WARNING To prevent damage to the cover and to prevent serious personal inj...

Страница 14: ...ngth of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main cover in the U Channel which is attached to the top of the end rafter NOTE Pull the cover tight as the spring is inserted into the U Channel 8 After the cover is stretched end to end and secured using the spring and U Channel move to one side of the fra...

Страница 15: ...of the roll up side 4 Place the assembled conduit at the base of the side where the end of the main cover is located NOTE Duct tape Tek screws to prevent damage to main cover 5 Continue with the procedure that follows to attach the conduit to the main cover ATTACH CONDUIT TO MAIN COVER ROLL UP SIDE Gather the parts Assembled conduits Fabric clips CC6212 Divide quantity in half Tek screws To this p...

Страница 16: ... NOTE Verify that the lower end of the channel is slightly off the ground to allow it to move freely when the panel is rolled up and down 5 Secure the upper end of the channel by drilling a 3 8 hole through the end rafter and attach as shown The lower end of the channel will float and is not attached NOTE Install a flat washer between the nut and the end panel if equipped Panel is not shown in the...

Страница 17: ...he aluminum channel from the ground end This is the free end of the channel 13 Roll the cover conduit up to the Twist of the Wrist assembly 14 Attach the rolled conduit to the square shaft of the assembly by inserting a carriage bolt through the hole in the conduit and tubing adapter Tighten the nut 15 Attach the crank handle to the Twist of the Wrist assembly Cover is not shown in the above diagr...

Страница 18: ...nnel and rafter leg insert an eyebolt and washer through the hole and secure the eyebolt with a nut NOTE If the poly latch U Channel was attached to a ribbon board as suggested the eyebolt can be mounted through the poly latch channel and ribbon board to the inside of the rafter 4 Attach the remaining eyebolts and eye screws using the diagram below as a pattern guide 5 Once all eyebolts eye screws...

Страница 19: ...er Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover or the side panels that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is moved ...

Страница 20: ...20 0 5 8 12 3 5 16 Width 2 3 Sidewall Height Grid Represents 12 Squares F FR RO ON NT T Photo may show a different but similar model The optional end panels additional purchase required are shown Actual building may differ Side struts are not shown in the above diagram Ground Level Ground Level ...

Страница 21: ...21 CLEARSPAN ECONOMY MOO TEL Revision date 01 26 18 FRONT PROFILE 102675 102675 End 102856 Middle 102548 20R1601 20R1601 20R1601 20R1602 166S027D 166S027D Ground Level ...

Страница 22: ...NOMY MOO TEL 22 SIDE PROFILE 107404 3 131S075 1 131P0735 Purlin Run Rafter Spacing 4 0 24 0 Length ATTENTION Dashed lines show the location of the diagonal struts installed along each side of the frame at each end Strut Strut Ground Level ...

Страница 23: ...n date 01 26 18 SIDE PROFILE 107405 5 131S075 1 131P0735 Purlin Run 4 0 Rafter Spacing 36 0 Length ATTENTION Dashed lines show the location of the diagonal struts installed along each side of the frame at each end Strut Strut Ground Level ...

Страница 24: ...NOMY MOO TEL 24 SIDE PROFILE 107406 ATTENTION Dashed lines show the location of the diagonal struts installed along each side of the frame at each end 7 131S075 1 131P0735 Purlin Run 4 0 Rafter Spacing 48 0 Length Ground Level Strut Strut ...

Страница 25: ...25 CLEARSPAN ECONOMY MOO TEL Revision date 01 26 18 CONNECTIONS End Rafter Purlin Connection View 1 Mid Rafter Purlin Connection View 2 ...

Страница 26: ...Revision date 01 26 18 CLEARSPAN ECONOMY MOO TEL 26 CONNECTION DETAILS 102548 Purlin Rafter View 2 Mid Rafter Purlin Connection Rafter Purlin 102856 View 1 End Rafter Purlin Connection ...

Страница 27: ...27 CLEARSPAN ECONOMY MOO TEL Revision date 01 26 18 This page is reserved for customer notes ...

Отзывы: