INSTALL PVC CONDUIT (CONTINUED)

Shelter shown above may be a different model and length. Photo used for 

illustration purposes only.

NOTE:

 Maintain an even distance between the end rafter and the PVC 

conduit as the strap is tightened. 

 

Also check that the bonnet portion of the main cover overlaps the end 

rafters evenly at both ends 

before

 stretching the cover. Check this 

periodically as the cover is stretched. 

 

If the side straps are too tight and prevent the cover from stretching end-to-

end, loosen but do not remove the straps as needed and continue.

Once the strap is tight at one end, cut it to length (if needed) and tie it to the 

13. 

other leg of the same end rafter.
At each end of the stretch hem strap, drive a Tek screw through the strap 

14. 

and into the back side of the rafter to secure the strap to the rafter. This 

helps keep the strap tight and in position.
Return to the other end of the frame and tighten that strapping (if needed) 

15. 

to complete the stretching of the main cover from end-to-end. Secure the 

strap using a Tek screw at each end (Step 14).
Continue by tightening the side ratchets.

16. 

Beginning at either end of the cover, tighten the strap. The strapping will 

12. 

pull against the strapping installed at the other end of the frame. 

TIGHTEN THE SIDE RATCHETS

Verify that the cover is in the desired position and centered on the frame. 

(Loosen and reposition if needed.) Continue with these steps to tighten the side 

ratchets.

Move to the side ratchets attached to each leg of one rafter. Begin at an 

1. 

inside rafter near the center of the frame.
With an assistant at one side ratchet and someone at the other side ratchet 

2. 

on the same rafter

, tighten the ratchets to secure the cover. 

 

Tightening the ratchets at the same time on the same rafter helps keep the 

cover centered and results in a more uniform appearance.
Move to another rafter and repeat the steps to tighten the side ratchets 

3. 

attached to that rafter. 

 

NOTE:

 If the strap builds up in the ratchet, loosen the ratchet, remove some 

of the strap, and retighten.
After all side ratchets (QH1065) are tight, position someone at each ratchet 

4. 

attached to the end rafter where the bonnet straps of the cover were 

previously inserted.

Tighten the end ratchets to secure the bonnet portion of the main cover.

5. 

Move to the other end of the building and secure the bonnet at that end.

6. 

Photo shows the 

QH1061 ratchet 

attached to the end 

rafter. QH1061 is 

used to secure the 

bonnet portion of the 

main cover.

Main Cover 

Bonnet

NOTE:

 Cover shown 

may differ from the 

actual cover for your 

building.

Содержание CL108544

Страница 1: ...ide Profile Connection Call Out Connection Details Rafter Pipe Details 3 17 2009 Cover and End Panel Details N A Width Center Center Sidewall Height Rafter Spacing Length Center Center Rafter Tubing Cover Conduit Tubing Height Ground Peak Purlin Tubing of Runs Cover Info End Wall Door End Wall Tubing End Panel Info CONTENT GUIDE N A 1 66 Round 12 5oz Shelter Information construction C 38 0 16 1 3 ...

Страница 2: ...s an important step before you begin to assemble the structure Always consult local and regional building codes before you begin The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structur...

Страница 3: ...ons before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are inserted and secu...

Страница 4: ...do not need to open the plastic bags containing the fasteners if used SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Inspect the shelter and all components frequently and regularly Regularly check the main cover and panels if equipped to see that these remain tight and in proper repair C...

Страница 5: ...t can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle After squaring the position of the building and placing a stake at all corners 3 string a line between the stakes to mark the base of the building Next mark a line on the ground using the strings between the stakes as...

Страница 6: ...16 1 3 4 H x 56 L 3 17 2009 Ground Level D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Engineering Approval Manger Approval Design Approval Shelter Description Shelter Dimensions Shelter Sku Number 38 x 56 Economy Building Drawn By Creation Date Last Revision Date CL108544 QH1061 Ratchet Attach to End Rafters only QH1061 Ratchet Attach to End Rafters only ...

Страница 7: ... Approval Manger Approval Engineering Approval CL108544 C1 1 0 SIDE PROFILE 38 W x 16 1 3 4 H x 56 L 3 17 2009 R R 108539 Cable Cable 108539 108539 R R R R R R NOTE R indicates ratchet locations 108539 Side Wall Cable Assembly F1 1 0 View 1 8 0 Rafter Spacing Center to Center 56 0 Length 6 166S099 1 166P096 1 66 Cover Conduit Pipe Assembly Purlin Tek Screw Connection F1 1 0 View 2 Secure QH1065 ra...

Страница 8: ...g Shelter Description Shelter Dimensions Shelter Sku Number Last Revision Date Creation Date Drawn By CL108544 D1 1 0 CONNECTIONS 38 W x 16 1 3 4 H x 56 L 3 17 2009 End Rafter Purlin Connection E1 1 0 View 1 Rafter Foot Connection E1 1 0 View 2 Mid Rafter Purlin Connection E1 1 0 View 3 QH1061 ratchet attached to end of end rafter QH1065 ratchet attached to side of same rafter ...

Страница 9: ... 2 Nut End Rafter 105350 Purlin Connection Bracket Rafter Coupler See Detail Below Mid Rafter 105350 Purlin Connection Bracket 3 8 x 1 Bolt 3 8 Nut 108539 1 2 x 5 1 2 Bolt 1 2 Nut 1 2 x 4 1 2 Bolt 1 2 Nut QH1065 Ratchet 108539 CONNECTION DETAILS View 1 End Rafter Purlin Connection View 2 Rafter Foot Connection 38 W x 16 1 3 4 H x 56 L 3 17 2009 View 3 Mid Rafter Purlin Connection CL108544 Rafter F...

Страница 10: ...r Sku Number Shelter Dimensions Shelter Description Design Approval Manger Approval Engineering Approval F1 1 0 CONNECTION DETAIL 38 W x 16 1 3 4 H x 56 L 3 17 2009 CL108544 View 2 Cable Clamps Cable Clamps Cable Thimble Jaw Jaw Turnbuckle Cable Thimble View 1 Side Wall Cable Assembly Conduit Tek Screw Connection Typical cable to frame connection Customer Supplied Baseboard ...

Страница 11: ...6 7 3 8 BEND LCTN N A DEGREE N A DRILL 9 16 38R40P4D DIA GA 4 00 10 GA PRE BEND 6 8 1 2 TYPE Plain PT TO PT 6 7 1 4 BEND LCTN N A DEGREE N A DRILL 9 16 38R40P3D DIA GA 4 00 10 GA PRE BEND 6 8 1 2 TYPE Plain PT TO PT 6 7 1 2 BEND LCTN N A DEGREE N A DRILL 9 16 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Last Revision Date 38 x 56 Economy Building Shelter Sku Number Shelte...

Страница 12: ...6 1 1 4 8 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Last Revision Date 38 x 56 Economy Building Shelter Description Shelter Dimensions Shelter Sku Number Design Approval Manger Approval Engineering Approval H1 1 0 MAIN COVER DETAILS 38 W x 16 1 3 4 H x 56 L 3 17 2009 CL108544 Over The Top Measurement 54 4 652 ...

Страница 13: ...eded to assemble a the cover conduit Insert the swaged end of each pipe into the b plain end of another pipe until the conduit is assembled See Side Profile diagram Secure each pipe joint with a Tek screw c Use duct tape to tape over each Tek screw d Locate the main cover and unfold it on a clean smooth surface near the frame Unfold the main cover with the inside surface facing up and the straps 2...

Страница 14: ... has not been properly secured Locate the black straps at the front and rear hems and feed the straps 5 through the center slot in each end ratchet QH1061 Operate the ratchet to wrap the strap onto the center hub just enough to keep the strap secure NOTE Use lifts and additional assistants if needed to help pull the cover up and over the frame Shelter shown above may be a different style or length...

Страница 15: ...n cover was pulled in place a slit in the cover pocket may already be present NOTE Do not tighten completely at this time Frame and ratchet location differ from actual frame Steps to install the main cover are similar however Feed one end through the slot in the cover pocket and around the conduit 3 Feed both ends of the strap through the slot in the ratchet and slightly 4 tighten the ratchet Repe...

Страница 16: ...it and feed it into the stretch pocket from 1 the bottom at one end of the cover Insert the plain end of the conduit into the pocket so the next section can be joined to the first Photo shows a similar cover and the location of the stretch pocket Cover is shown with the underside facing up which is the side visible from inside the frame when the cover is installed For some covers the notched porti...

Страница 17: ...d take one end of the bulk roll of 1 strapping and weave it around the end rafter and PVC conduit Continue weaving the strap around the end rafter and PVC conduit working 8 up and over the rafter and down to the other end of the PVC conduit NOTE Keep the strapping snug during this step but do not over tighten Also maintain a even distance between the end rafter and the PVC conduit Photo shows how ...

Страница 18: ... the strap The strapping will 12 pull against the strapping installed at the other end of the frame TIGHTEN THE SIDE RATCHETS Verify that the cover is in the desired position and centered on the frame Loosen and reposition if needed Continue with these steps to tighten the side ratchets Move to the side ratchets attached to each leg of one rafter Begin at an 1 inside rafter near the center of the ...

Страница 19: ...19 CLEARSPAN FABRIC STRUCTURES Revision date 09 08 09 This page is reserved for customer notes ...

Отзывы:

Похожие инструкции для CL108544