background image

 

15                                                                                                                    Pentz EF5 Installation Guide 

 

 

© Clear Vue Cyclones 2018 

 

Electrical – Single-Phase Motors

 

Clear Vue Cyclones highly recommends the use of a professional,  
licensed electrician to complete the wiring and any electrical work  
associated with this installation. Significant damage to your system and/or  
bodily harm can result.  
 

 

The Leeson 5HP motor is designed to rotate either clockwise or counter-clockwise.  Motors 
are prewired direct from Leeson and may be wired for either rotation.  You will need to 
check the wiring to ensure it is correct. 
 
Please also refer to the assembly sheet provided with the Electrical Box.   
 

1.  Follow the directions on the Leeson motor for wiring the motor for a clockwise rotation: 

a.  Connect 

L1

 to 

P1

b.  Connect 

L2

 to both 

T4

 & 

T8

c.  Connect 

P3

 & 

T1

 & 

T5

 – wire together and cap off with a wire lug. 

d.  Connect the ground wire (bare wire) to the green screw inside the motor connection 

box.   

Leeson recommends the use of wire lugs in lieu of wire nuts to secure all connections.   

 

Leeson defines motor rotation with the motor shaft facing away.  For our installation 

puposes, rotation is defined from the opposite end of the motor.  In order to obtain a 
counter-clockwise rotation when veiwed from below, please follow the clockwise 

instructions on Leeson’s motor plate, which match step 1 above. 

 

Once the motor is wired, it is important to verify the rotation of the impeller.  Disconnect the 

flex hose attached to the Blower Housing exhasut to check rotation.  From this vantage point, 

the impeller should be rotating from the back of the Blower Housing towards the front.   

 

Note that our impellers are backward inclined, allowing our system to move high volumes of 

air at a variety of static pressures.  Each blade on the impeller has a slight “C” shape.  When 

rotating correctly, the convex side of the blade will be hitting the air first.   

 

 

 

  
         

Содержание Pentz EF5

Страница 1: ...Clear Vue Cyclones 145 Nix Road Liberty SC 29657 888 299 0221 www clearvuecyclones com Pentz EF5 Installation Guide ...

Страница 2: ... drum Systems with a 55 gallon drum require a minimum floor to ceiling height of 119 inches The content of this manual is based upon the assembly of the system with the necessary ceiling height Leaks To maximize performance of your dust collection system it will be imperative to check for leaks Leaks on the suction side of the system will reduce the CFM cubic feet per minute performance levels We ...

Страница 3: ...s 7 Mounting the Backer Board and Wall Bracket for wall mounted systems only 8 Assembling the Metal Stand for stand mounted systems only 9 Constructing the Motor Assembly 10 Attaching the Impeller 11 Assembling and Hanging the Cyclone 12 Assembling the Flangeless Filter Stack filtered systems only 13 Installing the Exhaust and Collection Drum 14 Electrical Single Phase Motors 15 Electrical Three P...

Страница 4: ...3 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Dimensional Drawing ...

Страница 5: ...4 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Cyclone Components ...

Страница 6: ...me 2 hours with 2 people 2 hours with 2 people Motor Manufacturer Leeson Motor Company Leeson Motor Company HP Rating 5 HP non TEFC 5 HP non TEFC Speed 3 450 rpm 3 450 rpm Current Single Phase 20 8 FLA at 230V Three Phase 12 2 FLA at 230V 6 1 FLA at 460V Single Phase 20 8 FLA at 230V Three Phase 12 2 FLA at 230V 6 1 FLA at 460V Manual Overload Protection Yes Yes Electrical Minimum Circuit Size Sin...

Страница 7: ...n Tools 9 16 Wrench 7 16 Wrench Wrench 3 32 Hex Key Drill Level Hammer 6 Ladder Tape Measure Box Cutter 1 tube of Caulk o ALEX PLUS Acrylic Latex Caulk plus Silicone color Crystal Clear is recommended simply because it dries the clearest Other brands types may be used ...

Страница 8: ...nly o 1 band clamp o 1 20 x 1 bolt o 1 20 flat washer o 1 20 wing nut Filter Clean Out Box filtered systems only Electrical Box with Remote single phase systems only Hardware Kit Single Phase Hardware Kit Three Phase Hardware Kit o 12 20 x 1 Hex Bolts o 14 Split Lock Washers o 16 Flat Washers o 4 3 8 16 x Hex Bolts o 4 3 8 Flat Washers o 4 3 8 Lock Washers o 4 6 x 1 Sheet Rock Screws o 6 5 16 9 x ...

Страница 9: ...sition the screws no more than 2 from the outer edges of the Backer Board to allow enough clearance to mount the Wall Bracket b Locate at least 2 of the screws into a stud c Use a level to verify that the Backer Board is level If the holes in the Wall Mounting Bracket can be secured into at least 2 studs use of the Backer Board is optional If not used the top of the Wall Mounting Bracket must be m...

Страница 10: ... lower legs onto the center frame and tighten the set screws 3 Flip the stand over so the lower legs are facing down 4 Slide the 4 upper legs onto the center frame 5 Slide the upper frame onto the upper legs 6 Adjust the set screws to ensure stand is level It is recommended to bolt the stand to the floor to ensure it does not move Upper Frame Upper Legs Center Frame Lower Legs ...

Страница 11: ...owards the ceiling 3 Install 1 3 8 16 x hex bolt through each of the holes on the motor plate into the holes on the face of the motor using 1 3 8 lock washer and 1 3 8 flat washer per bolt For three phase motors substitute with 13 x 1 hex bolts lock washers and flat washers 4 Tighten each motor bolt securely Do NOT turn the motor on until the system is completely assembled including the collection...

Страница 12: ...r tighten the bolts to secure them in place Make sure the taper lock bolts are inserted through the larger non threaded holes in the taper lock bushing into the threaded holes of the impeller The alternate set of holes is used for impeller removal only 3 Position the impeller a Slide the impeller onto the motor shaft with the taper lock bushing facing up b Insert the motor key and lightly tighten ...

Страница 13: ...per Cylinder assembly up and lower it through the top opening of the stand so that the lip is resting on upper frame of the stand 4 Attach the Cone to the bottom of the Upper Cylinder using the 18 clamp 5 Install the motor impeller assembly a With the help of your installation partner turn the motor impeller assembly over so that the fins of the impeller are facing downward If your system came wit...

Страница 14: ... 20 wing nut on the hex bolt and tighten 4 Place the stacked filters on top of the Filter Clean Out Box a Run a bead of clear silicone caulk around the base of the filters where they meet the Filter Clean Out Box to ensure an airtight seal The silicone caulk will hold the filters securely in place and can be removed easily by cutting the bead with a razor knife b Run a bead of clear silicone caulk...

Страница 15: ... the base of the cyclone The flex hose will be an extremely tight fit around the base of the cyclone This is by design in order to make sure the connection is air tight The flex hose can be made more pliable for installation by heating it with a hair dryer c Tighten 6 flex hose clamp to secure flex hose to the base of the cyclone d Run a bead of clear silicone caulk around the seam at the top of t...

Страница 16: ...onnect the ground wire bare wire to the green screw inside the motor connection box Leeson recommends the use of wire lugs in lieu of wire nuts to secure all connections Leeson defines motor rotation with the motor shaft facing away For our installation puposes rotation is defined from the opposite end of the motor In order to obtain a counter clockwise rotation when veiwed from below please follo...

Страница 17: ...16 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Electrical Three Phase Motors Leeson recommends the use of wire lugs in lieu of wire nuts to secure all connections ...

Отзывы: