background image

 

12                                                                                                                    Pentz EF5 Installation Guide 

 

 

© Clear Vue Cyclones 2018 

 

Assembling and Hanging the Cyclone 

1.  Locate the Blower Housing and Upper Cylinder. 

a.  Determine the desired orientation of the cyclone intake on the Upper Cylinder 

relative to the exhaust opening on the Blower Housing. 

The position of the intake can be rotated in one of (12) different configurations with respect 
to the exhaust.  This will not affect system performance in any way.   

2.   Secure the Blower Housing to the Upper Cylinder: 

a.  Place the ¼” neoprene gasket on top of the Upper Cylinder, lining up the holes in 

the gasket with the holes on the top of the Upper Cylinder. 

b.  Position the Blower Housing, with the exhaust in the desired orientation with respect 

to the intake, lining up the holes on the bottom of the Blower Housing with the holes 
on the top of the Upper Cylinder.   

c.  Using a 

7

/

16

” wrench, secure the Blower Housing to the Upper Cylinder using (1) ¼"-

20 x 1" hex bolt, (1) ¼” lock washer and (1) flat washer per hole.   

d.  Repeat for all holes and tighten securely.   

3.  For wall-mounted systems, with the assistance of a helper, lift the Upper Cylinder assembly up 

and slide it back so that the lip is resting on the horizontal arms of the Wall Mounting Bracket.  

 

a.  For stand-mounted systems, lift the Upper Cylinder assembly up and lower it 

through the top opening of the stand so that the lip is resting on upper frame of the 
stand.  

 

4.  Attach the Cone to the bottom of the Upper Cylinder using the 18” clamp.

 

5.  Install the motor/impeller assembly: 

a.  With the help of your installation partner, turn the motor/impeller assembly over so that 

the fins of the impeller are facing downward.   

If your system came with an Electrical Box, it is recommended that you wire the 6’ whip into 
the wiring box of the motor first, prior to installing the motor/impeller assembly.  Please refer 
to the Electrical Box instruction sheet for more detail. 

b.  With the help your installation partner, lift the motor/impeller assembly up and lower 

the impeller down inside the Blower Housing.  Rotate the assembly so that the 
holes on motor plate line up with the holes on the Blower Housing top. 

Systems using a 30-gallon drum require a minimum of 113” of ceiling  
height in order to have adequate clearance above the Blower Housing  
for installing the motor/impeller assembly.  Systems using a 55-gallon  
drum require a minimum of 119” of ceiling height.   

c.  Secure the motor plate to the Blower Housing using (1) 

3

/

8

"-16 x 

3

/

4

" hex bolt, 

3

/

8

" lock 

washer and 

3

/

8

" flat washer per hole. 

d.  Tighten securely.  

Do NOT turn the motor on until the system is completely assembled,  
including the collection drum. Doing so may cause the circuit breaker  
to trip, physical damage to the system and/or bodily harm. 

Содержание Pentz EF5

Страница 1: ...Clear Vue Cyclones 145 Nix Road Liberty SC 29657 888 299 0221 www clearvuecyclones com Pentz EF5 Installation Guide ...

Страница 2: ... drum Systems with a 55 gallon drum require a minimum floor to ceiling height of 119 inches The content of this manual is based upon the assembly of the system with the necessary ceiling height Leaks To maximize performance of your dust collection system it will be imperative to check for leaks Leaks on the suction side of the system will reduce the CFM cubic feet per minute performance levels We ...

Страница 3: ...s 7 Mounting the Backer Board and Wall Bracket for wall mounted systems only 8 Assembling the Metal Stand for stand mounted systems only 9 Constructing the Motor Assembly 10 Attaching the Impeller 11 Assembling and Hanging the Cyclone 12 Assembling the Flangeless Filter Stack filtered systems only 13 Installing the Exhaust and Collection Drum 14 Electrical Single Phase Motors 15 Electrical Three P...

Страница 4: ...3 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Dimensional Drawing ...

Страница 5: ...4 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Cyclone Components ...

Страница 6: ...me 2 hours with 2 people 2 hours with 2 people Motor Manufacturer Leeson Motor Company Leeson Motor Company HP Rating 5 HP non TEFC 5 HP non TEFC Speed 3 450 rpm 3 450 rpm Current Single Phase 20 8 FLA at 230V Three Phase 12 2 FLA at 230V 6 1 FLA at 460V Single Phase 20 8 FLA at 230V Three Phase 12 2 FLA at 230V 6 1 FLA at 460V Manual Overload Protection Yes Yes Electrical Minimum Circuit Size Sin...

Страница 7: ...n Tools 9 16 Wrench 7 16 Wrench Wrench 3 32 Hex Key Drill Level Hammer 6 Ladder Tape Measure Box Cutter 1 tube of Caulk o ALEX PLUS Acrylic Latex Caulk plus Silicone color Crystal Clear is recommended simply because it dries the clearest Other brands types may be used ...

Страница 8: ...nly o 1 band clamp o 1 20 x 1 bolt o 1 20 flat washer o 1 20 wing nut Filter Clean Out Box filtered systems only Electrical Box with Remote single phase systems only Hardware Kit Single Phase Hardware Kit Three Phase Hardware Kit o 12 20 x 1 Hex Bolts o 14 Split Lock Washers o 16 Flat Washers o 4 3 8 16 x Hex Bolts o 4 3 8 Flat Washers o 4 3 8 Lock Washers o 4 6 x 1 Sheet Rock Screws o 6 5 16 9 x ...

Страница 9: ...sition the screws no more than 2 from the outer edges of the Backer Board to allow enough clearance to mount the Wall Bracket b Locate at least 2 of the screws into a stud c Use a level to verify that the Backer Board is level If the holes in the Wall Mounting Bracket can be secured into at least 2 studs use of the Backer Board is optional If not used the top of the Wall Mounting Bracket must be m...

Страница 10: ... lower legs onto the center frame and tighten the set screws 3 Flip the stand over so the lower legs are facing down 4 Slide the 4 upper legs onto the center frame 5 Slide the upper frame onto the upper legs 6 Adjust the set screws to ensure stand is level It is recommended to bolt the stand to the floor to ensure it does not move Upper Frame Upper Legs Center Frame Lower Legs ...

Страница 11: ...owards the ceiling 3 Install 1 3 8 16 x hex bolt through each of the holes on the motor plate into the holes on the face of the motor using 1 3 8 lock washer and 1 3 8 flat washer per bolt For three phase motors substitute with 13 x 1 hex bolts lock washers and flat washers 4 Tighten each motor bolt securely Do NOT turn the motor on until the system is completely assembled including the collection...

Страница 12: ...r tighten the bolts to secure them in place Make sure the taper lock bolts are inserted through the larger non threaded holes in the taper lock bushing into the threaded holes of the impeller The alternate set of holes is used for impeller removal only 3 Position the impeller a Slide the impeller onto the motor shaft with the taper lock bushing facing up b Insert the motor key and lightly tighten ...

Страница 13: ...per Cylinder assembly up and lower it through the top opening of the stand so that the lip is resting on upper frame of the stand 4 Attach the Cone to the bottom of the Upper Cylinder using the 18 clamp 5 Install the motor impeller assembly a With the help of your installation partner turn the motor impeller assembly over so that the fins of the impeller are facing downward If your system came wit...

Страница 14: ... 20 wing nut on the hex bolt and tighten 4 Place the stacked filters on top of the Filter Clean Out Box a Run a bead of clear silicone caulk around the base of the filters where they meet the Filter Clean Out Box to ensure an airtight seal The silicone caulk will hold the filters securely in place and can be removed easily by cutting the bead with a razor knife b Run a bead of clear silicone caulk...

Страница 15: ... the base of the cyclone The flex hose will be an extremely tight fit around the base of the cyclone This is by design in order to make sure the connection is air tight The flex hose can be made more pliable for installation by heating it with a hair dryer c Tighten 6 flex hose clamp to secure flex hose to the base of the cyclone d Run a bead of clear silicone caulk around the seam at the top of t...

Страница 16: ...onnect the ground wire bare wire to the green screw inside the motor connection box Leeson recommends the use of wire lugs in lieu of wire nuts to secure all connections Leeson defines motor rotation with the motor shaft facing away For our installation puposes rotation is defined from the opposite end of the motor In order to obtain a counter clockwise rotation when veiwed from below please follo...

Страница 17: ...16 Pentz EF5 Installation Guide Clear Vue Cyclones 2018 Electrical Three Phase Motors Leeson recommends the use of wire lugs in lieu of wire nuts to secure all connections ...

Отзывы: