background image

Fleck 5600-SXT Softener Installation & Startup Guide 

Page 13

 

www.cleanwaterstore.com 

Rev 072514 

38.

 

After 60 minutes of being in this Cycle 2, referred to as the brining cycle, it will move to the next 
cycle, Cycle 3, which is a 6 minute second backwash cycle.  The next cycle, Cycle 4 is a 6 minute rapid 
rinse.   Finally Cycle 5 refills the brine tank. 

39.

 

Check to make sure at the end of the cycles that the brine tank is filled with enough water to cover 
salt.  You can change the level of the brine by adjusting the level of the float assembly.  For most 
users though it is not necessary to adjust the float, it comes set to the correct level. 

40.

 

After the regeneration process is complete, turn on the water to the house and run the water in the 
house for a few minutes.   

41.

 

Refer to your Fleck 5600-SXT service manual for more information about how your control valve is 
programmed if desired. 

Maintaining Your Softener 5600-SXT System 

Adding Salt to the Brine Tank

:    

Be sure to check the level of salt every few months (typically 3-4 months).  You will see that the salt level will 
drop after a certain period of time based on your usage, at which point you will want to add more salt as you 
did the first time.   

Replacing Brine Valve, Injectors and Screen 

1. Turn off water supply to conditioner: 

If the conditioner installation has a “three valve” bypass system, first open the valve in the bypass 
line, then close the valves at the conditioner inlet and outlet. 
If the conditioner has an integral bypass valve, put it in the Bypass position. 
If there is only a shut-off valve near the conditioner inlet, close it. 

 
2. Relieve water pressure in the conditioner by stepping the control into the Backwash position momentarily.  
Return the control to the In Service position. 
 
3. Unplug electrical cord from outlet. 
 
4. Disconnect brine tube and drain line connections at the injector body. 
 
5. Remove the two injector body mounting screws. The injector and brine module can now be removed from 
the control valve. Remove and discard brine body O-rings. 
 

Brine Valve Replacement 

1. Pull brine valve from injector body. Also remove and discard O-ring at bottom of brine valve hole. 
 
2. Apply silicone lubricant to new O-ring and reinstall at bottom of brine valve hole. 
 
3. Apply silicone lubricant to O-ring on new valve assembly and press into brine valve hole. Be sure shoulder 
on bushing is flush with injector body. 

Содержание Fleck 5600-SXT

Страница 1: ...ll help guide you in the installation and start up of your new system The Fleck service manual covers other types of systems as well such as water softeners and filters so there may be information in your Fleck service manual that does not pertain to your system Please review this start up guide entirely before beginning to install your system and follow the steps outlined for best results Questio...

Страница 2: ...e valve 9 Maintaining Your Softener 5600 SXT System 13 Replacing Brine Valve Injectors and Screen 13 Brine Valve Replacement 13 Injectors Screen Replacement 14 Troubleshooting the Fleck 5600 SXT Softener 14 More Troubleshooting Tips 16 Brine Solution Not Being Sucked In During Regeneration 16 System Not Backwashing Adequately 17 System Not Programmed Correctly PROGRAM SETTINGS 17 Brine Tank Not Fi...

Страница 3: ... Model Size 32K Grain Softener Quantity Description 1 9 x 48 filter tank with distributor tube 1 1 cubic foot box of softening media resin Model Size 48K Grain Softener Quantity Description 1 10 x 54 filter tank with distributor tube 1 1 cubic foot box of softening media resin 1 cubic foot box of softening media resin Model Size 64K Grain Softener Quantity Description 1 12 x 52 filter tank with di...

Страница 4: ...articularly if this is older piping that has been exposed to iron or manganese for some time Typically this clears up over a day or two but can persist for weeks if the pipe is old galvanized iron pipe that is corroded Best Practices for Piping Drain Installation 1 See typical installation see Fig 1 The softener is installed after the pressure tank 2 Make sure to connect the inlet pipe to the Flec...

Страница 5: ...acks up it cannot cross connect with the drain tubing How Your Softener Works See Fig 1 In the softener the water enters the top of the tank and flows down through the media and up the distributor tube Hardness minerals are drawn to the resin beads in the softener During backwash the water flow is reversed and water flows down the distributor tube and up through the media lifting and expanding the...

Страница 6: ...er Installation Startup Guide Page 5 www cleanwaterstore com Rev 072514 Fig 2 Typical Softener Fleck 5600 SXT piping installation with ball valve and hose bib after the filter along with pre and post filtration if necessary ...

Страница 7: ... 5600 SXT from the rear showing the inlet and outlet end connector fittings 1 or 1 1 4 NPT in Noryl plastic Brass end connectors are also available for connecting to copper tubing Fig 4 Fleck 5600 SXT top view Inlet Outlet To Drain To Brine Tank Inlet Outlet To Drain Bypass Knobs shown in bypass position ...

Страница 8: ...e distributor tube 2 Next add the softening resin using the media funnel provided If you purchased a Fine Mesh Resin Softener add the included gravel first Tank will be approximately 2 3to the 3 4 full 3 Remove cap or tape from top of distributor tube Be careful not to pull up distributor tube when removing cap or tape 4 Attach plastic top screen to the under side of the Fleck 5600 SXT control val...

Страница 9: ...e Fleck 5600 SXT threads into the tank 6 Install the Fleck 5600 SXT backwash control timer valve on to the top of the filter tank by hand do not over tighten Tighten by hand there is no need for a pipe wrench or other wrench 7 See the bypass image below Note that Item 2 is the plastic pipe connector yoke Items 3 are the metal clips that hold the pipe connector yoke onto the bypass valve To put sys...

Страница 10: ...ake sure inlet is installed to the In pipe connector on the bypass valve and outlet is on the Out connector Note Arrows on bypass valve should be visible from the top of the bypass valve 11 Connect some flexible tubing from the drain connection on the Fleck 5600 SXT control valve to a suitable drain such as a septic tank or drain to a sewer It is OK to run the drain line up and over the Fleck 5600...

Страница 11: ...ess The tubing should be firmly attached and not slide out if pulled on 14 Repeat step 14 to attach the tubing to the perm solution tank This uses the same process but on the brine tank valve Or it may need to be installed like this with the tube going through depending on the design below 15 Add approximately 5 gallons of water to the brine tank and then fill the brine tank about 2 3 full of salt...

Страница 12: ...vely clear The water may have some color at first 20 Your Softener 5600 SXT control valve does require some modifications to the programming specific to your application To enter the programming mode you just need to set the time to 12 01 PM To do this hold either the up or down button until the time display starts changing Then push the extra cycle button to exit the time setting mode 21 Next hol...

Страница 13: ...or softener is likely to be in regeneration cycle Press the Extra Cycle button to go to the next step 32 Regeneration Cycle Step Times Use this display to set the various minutes of each cycle Use the Up or Down arrows to change the setting to the desired setting Press the Extra Cycle button to accept the setting and move to the next parameter a B1 Backwash Set to 8 minutes b BD Brine Draw Set to ...

Страница 14: ...tain period of time based on your usage at which point you will want to add more salt as you did the first time Replacing Brine Valve Injectors and Screen 1 Turn off water supply to conditioner If the conditioner installation has a three valve bypass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet If the conditioner has an integral bypass va...

Страница 15: ... conditioner NOTE Be sure to shut off any bypass line 8 Check for leaks at all seal areas Check drain seal with the control in the Backwash position 9 Plug electrical cord into outlet 10 Set Time Of Day and cycle the control valve manually to assure proper function Make sure control valve is returned to the In Service position 11 Be sure there is enough salt in the brine tank 12 Start regeneration...

Страница 16: ...aterial broken loose from pipes by recent work done on plumbing system Remove piston and clean control Loss of softening resin through drain line Air in water system Assure that well system has proper air eliminator control Check for dry well condition Improperly sized drain line flow control Check for proper drain rate Iron in conditioned water Fouled mineral bed Check backwash brine draw and bri...

Страница 17: ...rol valve 2 Press the Extra Cycle button and hold for several seconds until a backwash is started After the display stops blinking and it is in a backwash cycle press the Extra Cycle button again and it will advance to the next cycle which is the Brine Cycle where it is supposed to suck in the brine solution 3 If it is sucking strongly check the brine tank float inside the brine well and make sure...

Страница 18: ...r in the start up guide Brine Tank Not Filling With Enough Water Sometimes if the brine tank is not filling adequately it is possible that the float assembly in the tank is set too low You would want the float to be several inches above the air check valve inside the tank This will allow for enough water to be added to the tank before shutting the brine fill cycle If necessary pull the float assem...

Отзывы: