17.

 

Now you are ready to turn on the water to the system.  Turn on the water and leave on bypass and 
check for leaks.  Leave the ball valve after the softener closed, so water is still off to the house, but 
connect a garden hose and open up the hose bib after the softener and allow the water to run.  This 
will help to clear out any foreign material that may be in the pipes from the piping installation.  If you 
do not have a valve installed after the softener and you do not have a hose bib, you will need to turn 
the water on inside the house to let the water run. Use a bathtub or laundry sink or other fixture that 
does not have an aerator screen. 

18.

 

Leave the water running out of the garden hose at a slow rate. Now you can turn the bypass valve to 
the service position.  You do NOT remove the red clips on the bypass knobs in order to turn the 
bypass valves from the bypass to the service position.  First open the Inlet Side of the bypass valve.  
Second slowly open the Outlet Side of the bypass until it is in the full service position.   The Fleck 
5600-SXT bypass valve knobs are a little stiff, so you can use a screw driver placed in the holes to turn 
the knobs.  Make sure you are turning the bypass valve knobs in the correct direction which is 
counter-clockwise as you face the bypass valve knobs. 

19.

 

Now turn on the garden hose to full force and let the water until it turns relatively clear.   The water 
may have some color at first. 

20.

 

Your Softener 5600-SXT control valve does require some modifications to the programming specific to 
your application.  To enter the programming mode, you just need to set the time to 

12:01 PM

.  To do 

this, hold either the up or down button until the time display starts changing.  Then push the extra 
cycle button to exit the time-setting mode. 

21.

 

Next, hold down the up arrow and down arrow at the same time for 5 seconds.  This will enter you 
into the Master Programming Mode. Change the parameters according to the following guide 

22.

 

Display Format (Display Code DF): Set display to GAL 

(stands for U.S. Gallons), or change to Liters or 

Cubic Meter is outside the U.S.  Press the Extra Cycle button to go to the next step

 

23.

 

Valve Type (Display Code VT): Set to DF1b.

 This means it is set for standard Downflow mode.  Press 

the Extra Cycle button to go to the next step.

 

24.

 

Control Type (Display Code CT): Set to Fd.  

This is the Meter Delayed option.  This tells the Fleck 

5600-SXT control to meter or keep track of the amount of water used, but then wait until the pre-set 
regeneration (backwash and rinse cycles) time, typically in the middle of the night.  Press the Extra 
Cycle button to continue.

 

25.

 

Unit Capacity (Display Code C): Set to 32 if you have a 32K grain capacity softener; 48 if you have a 
48K grain softener, 64 if you have a 64K grain softener, or 80 if you have an 80K grain softener.  

Use 

this display to set the Unit Capacity.  This setting specifies the treatment capacity of the unit.  Press 
the Extra Cycle button to go to the next step.

 

26.

 

Number of Tanks (Display Code N):

 Set to 1, as this is a single-tank system.  Press the Extra Cycle 

button.

 

Содержание Fleck 5600-SXT

Страница 1: ...ll help guide you in the installation and start up of your new system The Fleck service manual covers other types of systems as well such as water softeners and filters so there may be information in your Fleck service manual that does not pertain to your system Please review this start up guide entirely before beginning to install your system and follow the steps outlined for best results Questio...

Страница 2: ...e valve 9 Maintaining Your Softener 5600 SXT System 13 Replacing Brine Valve Injectors and Screen 13 Brine Valve Replacement 13 Injectors Screen Replacement 14 Troubleshooting the Fleck 5600 SXT Softener 14 More Troubleshooting Tips 16 Brine Solution Not Being Sucked In During Regeneration 16 System Not Backwashing Adequately 17 System Not Programmed Correctly PROGRAM SETTINGS 17 Brine Tank Not Fi...

Страница 3: ... Model Size 32K Grain Softener Quantity Description 1 9 x 48 filter tank with distributor tube 1 1 cubic foot box of softening media resin Model Size 48K Grain Softener Quantity Description 1 10 x 54 filter tank with distributor tube 1 1 cubic foot box of softening media resin 1 cubic foot box of softening media resin Model Size 64K Grain Softener Quantity Description 1 12 x 52 filter tank with di...

Страница 4: ...articularly if this is older piping that has been exposed to iron or manganese for some time Typically this clears up over a day or two but can persist for weeks if the pipe is old galvanized iron pipe that is corroded Best Practices for Piping Drain Installation 1 See typical installation see Fig 1 The softener is installed after the pressure tank 2 Make sure to connect the inlet pipe to the Flec...

Страница 5: ...acks up it cannot cross connect with the drain tubing How Your Softener Works See Fig 1 In the softener the water enters the top of the tank and flows down through the media and up the distributor tube Hardness minerals are drawn to the resin beads in the softener During backwash the water flow is reversed and water flows down the distributor tube and up through the media lifting and expanding the...

Страница 6: ...er Installation Startup Guide Page 5 www cleanwaterstore com Rev 072514 Fig 2 Typical Softener Fleck 5600 SXT piping installation with ball valve and hose bib after the filter along with pre and post filtration if necessary ...

Страница 7: ... 5600 SXT from the rear showing the inlet and outlet end connector fittings 1 or 1 1 4 NPT in Noryl plastic Brass end connectors are also available for connecting to copper tubing Fig 4 Fleck 5600 SXT top view Inlet Outlet To Drain To Brine Tank Inlet Outlet To Drain Bypass Knobs shown in bypass position ...

Страница 8: ...e distributor tube 2 Next add the softening resin using the media funnel provided If you purchased a Fine Mesh Resin Softener add the included gravel first Tank will be approximately 2 3to the 3 4 full 3 Remove cap or tape from top of distributor tube Be careful not to pull up distributor tube when removing cap or tape 4 Attach plastic top screen to the under side of the Fleck 5600 SXT control val...

Страница 9: ...e Fleck 5600 SXT threads into the tank 6 Install the Fleck 5600 SXT backwash control timer valve on to the top of the filter tank by hand do not over tighten Tighten by hand there is no need for a pipe wrench or other wrench 7 See the bypass image below Note that Item 2 is the plastic pipe connector yoke Items 3 are the metal clips that hold the pipe connector yoke onto the bypass valve To put sys...

Страница 10: ...ake sure inlet is installed to the In pipe connector on the bypass valve and outlet is on the Out connector Note Arrows on bypass valve should be visible from the top of the bypass valve 11 Connect some flexible tubing from the drain connection on the Fleck 5600 SXT control valve to a suitable drain such as a septic tank or drain to a sewer It is OK to run the drain line up and over the Fleck 5600...

Страница 11: ...ess The tubing should be firmly attached and not slide out if pulled on 14 Repeat step 14 to attach the tubing to the perm solution tank This uses the same process but on the brine tank valve Or it may need to be installed like this with the tube going through depending on the design below 15 Add approximately 5 gallons of water to the brine tank and then fill the brine tank about 2 3 full of salt...

Страница 12: ...vely clear The water may have some color at first 20 Your Softener 5600 SXT control valve does require some modifications to the programming specific to your application To enter the programming mode you just need to set the time to 12 01 PM To do this hold either the up or down button until the time display starts changing Then push the extra cycle button to exit the time setting mode 21 Next hol...

Страница 13: ...or softener is likely to be in regeneration cycle Press the Extra Cycle button to go to the next step 32 Regeneration Cycle Step Times Use this display to set the various minutes of each cycle Use the Up or Down arrows to change the setting to the desired setting Press the Extra Cycle button to accept the setting and move to the next parameter a B1 Backwash Set to 8 minutes b BD Brine Draw Set to ...

Страница 14: ...tain period of time based on your usage at which point you will want to add more salt as you did the first time Replacing Brine Valve Injectors and Screen 1 Turn off water supply to conditioner If the conditioner installation has a three valve bypass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet If the conditioner has an integral bypass va...

Страница 15: ... conditioner NOTE Be sure to shut off any bypass line 8 Check for leaks at all seal areas Check drain seal with the control in the Backwash position 9 Plug electrical cord into outlet 10 Set Time Of Day and cycle the control valve manually to assure proper function Make sure control valve is returned to the In Service position 11 Be sure there is enough salt in the brine tank 12 Start regeneration...

Страница 16: ...aterial broken loose from pipes by recent work done on plumbing system Remove piston and clean control Loss of softening resin through drain line Air in water system Assure that well system has proper air eliminator control Check for dry well condition Improperly sized drain line flow control Check for proper drain rate Iron in conditioned water Fouled mineral bed Check backwash brine draw and bri...

Страница 17: ...rol valve 2 Press the Extra Cycle button and hold for several seconds until a backwash is started After the display stops blinking and it is in a backwash cycle press the Extra Cycle button again and it will advance to the next cycle which is the Brine Cycle where it is supposed to suck in the brine solution 3 If it is sucking strongly check the brine tank float inside the brine well and make sure...

Страница 18: ...r in the start up guide Brine Tank Not Filling With Enough Water Sometimes if the brine tank is not filling adequately it is possible that the float assembly in the tank is set too low You would want the float to be several inches above the air check valve inside the tank This will allow for enough water to be added to the tank before shutting the brine fill cycle If necessary pull the float assem...

Отзывы: