background image

clas.com

 PONT ELEVATEUR 2 COLONNES 400V 6T 

PASSAGE HAUT 4480mm 2.6Kw 

 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2.6Kw 

 PE  2011T 

Содержание PE 2011T

Страница 1: ...clas com PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw PE 2011T...

Страница 2: ...e un cylindre lorsque l on pompe l huile dans le cylindre le poteau du cylindre se d place vers le haut pour maintenir le chariot en mouvement Syst me de soutien Apr s avoir conduit le v hicule dans l...

Страница 3: ...PE 2011T PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 3 SCH MA DE CONFIGURATION Image 1...

Страница 4: ...PE 2011T PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 4 Image 2...

Страница 5: ...garantir un levage et un abaissement de niveau Toute inclinaison peut affecter les performances de la machine Il est interdit d installer la machine sur un sol en asphalte Selon les exigences du sol l...

Страница 6: ...tr s important pour la disposition du sol photo 2 S il n est pas correct il peut y avoir des probl mes pendant l installation et le fonctionnement L erreur de niveau totale est inf rieure 4 mm ce qui...

Страница 7: ...oteau Lors de la fixation l utilisation de la cl dynamom trique ne pas utiliser des outils impact pour serrer Sch ma d installation du poteau Orientation de la poutre transversale Fixer la traverse se...

Страница 8: ...as oscillant sur le chariot et fixez le l aide de la goupille image 20 2 Installez ensuite l extension centrale dans le bras oscillant puis installez la vis pour viter qu elle ne glisse 3 De m me inst...

Страница 9: ...nches de s curit se rapprochent du chariot ce qui verrouille efficacement le chariot Lorsque l crou du noyau d acier lectromagn tique se trouve la racine du fil deux planches de s curit peuvent s ouvr...

Страница 10: ...ctrique et la boucle d air selon le sch ma de la boucle d air Seul un personnel qualifi et autoris peut installer la partie lectrique Ouvrez d abord le couvercle du bo tier de commande Connexion l ali...

Страница 11: ...ment de poids lourds Remarque V rifier chaque tuyau et raccord d huile pour s assurer qu il n y a pas de fuite avant d utiliser le pont l vateur Utilisez tous les bras pour soulever le v hicule sur le...

Страница 12: ...d une charge l g re est convenable mais pas le levage d une charge lourde La pression de s curit r gl e de la soupape de d charge peut tre augment e en tournant l g rement le bouton de r glage vers l...

Страница 13: ...pr sentant des r clamations et des documents selon les lois en vigueur dans le pays o le rack est install au moment de la d molition de la machine ANNEXE Syst me hydraulique En appuyant sur le bouton...

Страница 14: ...directement sur notre site clas com Si vous avez chang d avis concernant votre achat veuillez retourner ce produit avant d essayer de l installer Before returning this product for any reason installa...

Страница 15: ...IPLE Lifting fabric Each post has one cylinder when pump the oil into the cylinder the cylinder pole will move upwards to hold the carriage move upwards Support fabric After driving the vehicle into t...

Страница 16: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 16 CONFIGURATION DRAWING Image 1...

Страница 17: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 17 Image 2...

Страница 18: ...should be level to ensure level lifting and lowering Any slant can affect the performance of the machine Forbid to install the machine on asphaltum floor According to the floor requirement can only i...

Страница 19: ...r layout It s very important for the floor layout picture 2 If it s not correct there may be some problems during installation and operation The total level error is less than 4mm which can decrease t...

Страница 20: ...he same and insert the bolt The air anchor made against the washer to under the post When fastening to the use of torque wrench do not use impact tools to tighten Installation drawing of post Orientat...

Страница 21: ...e 1 Install the swing arm on the carriage and then use the pin fix it picture 20 2 Then install the middle extension in the swing arm and then install the screw to prevent sliding out 3 As well instal...

Страница 22: ...rrect standard of unlocking adjustment is as follow When nut of electromagnetic steel core is at the end see picture 10 11 two safety board strike close to the carriage to lock the carriage effective...

Страница 23: ...diagram and air loop according to air loop diagram Only authorized qualified personnel can install the electrical part Open the control box cover first Power connection Connect the 3 phase five wires...

Страница 24: ...ing test To check whether hydraulic system works normally when loading heavy weight Notice Check every oil pipe and fitting to ensure no leakage before operating the lift Use all the arms when lifting...

Страница 25: ...the power supply wires lifting with light load is normal but no lifting with heavy load The set safe pressure of the over flow valve may be increased by turning the set knob right ward slightly The s...

Страница 26: ...it should be recalled that for tax purposes demolition must be documented submitting claims and documents according to the current laws in the country in which the rack is installed at the time the m...

Страница 27: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 27 Circuit drawing Picture 15...

Страница 28: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 28...

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...you need components or parts please contact the reseller In case of problems please contact your authorized technician CLAS Equipements 83 chemin de la CROUZA 73800 CHIGNIN FRANCE T l 33 0 4 79 72 62...

Отзывы: