PE 2011T
2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE
4480mm 2.6Kw
23
Safety block
Electromagnetic steel
Installation of anti-breaking rope insurance limit switch
• Install the limit switch on the top of post.
• Let the roller limit switch contact the spring washer.
• Connect the wires of limit switch according to the electrical diagram.
Installation of control box of wires
• Fix the control box on the post with bolt.
• Connect the wires according to electrical diagram and air loop according to air loop diagram.
Only authorized qualifi ed personnel can install the electrical part.
• Open the control box cover fi rst.
• Power connection:
Connect the 3 phase fi ve wires (3×2.5mm
2
+2×1.5 mm
2
) for the power supply to terminals
L1#, L2# & L3# and N#inside the control box and PE to the earth marked bolt.
If for 230V connection, connect to L2#, N2# to terminals in control box and PE# to the earth
marked bolt.
• Unlocking electromagnetic steel connection: Connect the Y1# and 0V# of the steel to the same
no in control box.
• Up limit switch connection: Connect the 0# and X4# of the steel to the same no in control box.
Image 10
Image 11
Image 12
Содержание PE 2011T
Страница 3: ...PE 2011T PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 3 SCH MA DE CONFIGURATION Image 1...
Страница 4: ...PE 2011T PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 4 Image 2...
Страница 16: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 16 CONFIGURATION DRAWING Image 1...
Страница 17: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 17 Image 2...
Страница 27: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 27 Circuit drawing Picture 15...
Страница 28: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 28...
Страница 29: ......
Страница 30: ......
Страница 31: ......