8
Adequate ventilation should also considerably reduce the possibility of
condensation occurring and lessen the dangers from the presence of any
undetected gas leakage. The following table shows the smallest sizes of room
suitable for each heat setting and the ventilation which should be provided.
HEATER PREPARATION
INSTALLING THE BOTTLE
The connection to the gas bottle must be carried out in a well ventilated
area, using the regulator and hose assembly supplied with the heater. DO
NOT attempt to adjust this regulator. It has been preset at the factory to
provide safe and correct operation.
1. Remove the bottle retainer from
the back of the heater.
2. Fix the gas regulator to the gas
hose, securing it with the
screwed hose clip supplied.
3. Place the filled gas bottle into
the back of the heater with the
valve outlet facing outwards.
4. Connect the gas regulator onto
the outlet of the gas bottle using
the integral clasp.
5. When attaching the regulator to
the gas cylinder ensure the
bottle outlet is perfectly clean.
•
Use compressed air if necessary to blow away any dust or dirt. When
connected, check for leaks using soapy water or liquid soap as described
below.
6. Secure the bottle with the bottle retainer.
TESTING FOR LEAKS:
This must be carried out In a well ventilated area, free from any open flame
or other sources of ignition. With the regulator connected to the cylinder,
slowly turn on the regulator and proceed as follows:
c
i
m
a
r
e
c
f
o
r
e
b
m
u
N
e
s
u
n
i
s
r
e
n
r
u
b
e
z
i
S
m
o
o
R
n
o
i
t
a
l
i
t
n
e
V
l
e
v
e
L
w
o
L
l
e
v
e
L
h
g
i
H
1
m
0
4
3
m
c
0
4
2
m
c
0
4
2
2
m
0
7
3
m
c
0
7
2
m
c
0
7
2
3
m
5
0
1
3
m
c
5
0
1
2
m
c
5
0
1
2
Содержание MGH1
Страница 1: ...OPERATING MAINTENANCE INSTRUCTIONS GC0911 Mobile Gas Heater Model No MGH1 PART NO 6920021...
Страница 13: ...13 PARTS DIAGRAM...
Страница 15: ...15 DECLARATION OF CONFORMITY...
Страница 16: ......