10. Fit the chain and hook assembly to the end of the boom extension by
sliding the end chain link into the slot provided and threading the bolt (1)
through the locating hole and chain link.
11. Fit the handle assembly to the main support post using four bolts item 12.
Screw the eye bolts (2), firmly into place in their captive nuts at each side
of the rear support to prevent loss.
• These are used to locate the front legs when folding the crane for
storage.
12. Finally check to ensure that all nuts are fully tightened with the exception of
the single bolt on the underside of the extension support (C), which should
be firm, but not tight.
• The hydraulic ram assembly, wheels and castors should all operate
freely.
OPERATION
1. When removing an engine, ensure the vehicle is well supported and
secure. All ancillary parts must be disconnected including cables, hoses,
exhaust system etc and only lifting points recommended by the vehicle
manufacturer should be used.
2. To raise the jib arm, or boom, first locate the slotted end of the pump
handle onto the hydraulic pressure release nut at the base of the ram
assembly. Turn the nut clockwise until tight, then remove the handle and
locate it in the pump collar. Pump the ram to raise the jib to the required
height.
3. To lower the jib arm, locate the slotted end of the pump handle onto the
hydraulic pressure release nut and very slowly turn in an anti-clockwise
direction. The jib will lower under its own weight.
STORAGE
FOLDING THE CRANE FOR STORAGE
IMPORTANT: ALWAYS get adult assistance when folding the crane into its
storage configuration
1. Lower the boom to its lowest position.
2. Remove the eyebolts (4) from the extension support. This allows the support
to swivel sufficiently to clear the front legs. Once the support has been
Содержание CFC500F
Страница 1: ...OPERATING MAINTENANCE INSTRUCTIONS GC12 13 1 2 TON CRANE MODEL NO CFC500F PART NO 7610610 ...
Страница 12: ......