Clarke Burnisher Скачать руководство пользователя страница 15

Page  14

Clarke

®

 

 Propane Burnishers Operator's  Manual

Preparing The Machine For Use

BEFORE using any type of powered equipment, proper safety
dictates you should visually inspect it.
1.

Adjust the HANDLE to a comfortable height and tighten the
bolts to 30-50- ft/lbs.

2.

BONNET FILTER - Make sure the bonnet air filter atop the
engine is clean.  It should be changed hourly and thoroughly
cleaned before reuse.

3.

Check the engine OIL LEVEL.  Make sure the machine is in a
level position.

** HONDA - 

DO NOT

 screw the dipstick in to get reading.

**KAWASAKI - 

DO NOT

 screw the dipstick in to get reading.

4.

Fill the tank following the instructions as given under the
previous heading: "Refilling And Storing Propane Tanks."  In
addition, if your buffer came with an "80% Safety Fill Tank"
then it should ONLY be filled through the threaded valve with
the larger diameter that is covered by a yellow cap to ensure
a "Full" level that is safe.

5.

PAD AND PAD HOLDER - Inspect the condition of the pad and
pad holder.  Is there a pad? Is it properly attached? What is its
condition?  Ensure the pad is clean and has at least a
thickness of 1/3 inch.  ALWAYS turn off the engine to clean or
replace pad.

6.

TANK and FUEL LINES - The tank has already been covered
but do the fuel lines show any sign of wear and tear, such as
cracks or any corrosion?  Screw the brass fuel line fitting onto
the tank service valve hand tight only.  This connection MUST
be secure because the service valve has a safety valve inside
it which will only open if the brass fuel line fitting is COM-
PLETELY seated into the service valve.

Starting the Engine

1.

Plug in 110 volt starter cord on models so equipped.

2.

We recommend setting the throttle on models with 110 volt
starter to the following positions:
** HONDA - Set throttle/choke to the "choke" position.
**KAWASAKI - The KAWASAKI single cylinder and Kawasaki
twin cylinder engines are designed to be started in the 

IDLE

throttle position.  This creates a vacuum necessary to open
the lock-off valve inside the regulator.  Actuation of the throttle
lever will keep the lock-off valve from opening and the engine
from getting fuel so the engine will not start.  Proper mainte-
nance will insure easy starting.

3.

Open (counterclockwise) the service valve on the propane
tank about one and a half turns.

4.

Ensure the buffer is tilted back so that the pad is off the floor
on all machines without a clutch.

5.

Engage starter for a MAXIMUM of 5 to 6 seconds or until the
engine fires.  Serious starter damage will result if this is
exceeded and the warranty may not apply.

6.

Open the "choke" until the engine runs smoothly. (HONDA
ONLY)

7.

Operate the engine at half throttle for approximately two
minutes for proper warm-up.  Then advance to full throttle for
best results.

NOTE: If the engine refuses to start, see the Trouble  Shooting Guide.

Stopping The Engine

1.

Close (clockwise) the service valve on the propane tank.

2.

ALWAYS allow the engine to run until it stops from lack of fuel.
** ONLY IN AN EMERGENCY should the "stop" position on a
HONDA throttle or the "kill switch" on a KAWASAKI and ONAN
models be used.

3.

Disconnect the fuel line from the tank.

4.

REMEMBER, when you are finished with the machine, store
the propane tank outside the building, in a safe place away
from heat or direct sunlight.

How to Operate the Machine

Maintenance And Adjustments

Emission Control Information

To protect the environment in which we will live, the manufacturer
has incorporated crankcase emission (1) and exhaust emission
(2) control systems (EM) in compliance with applicable regulations
of the United States Environmental Protection Agency and
California Air Resources Board.
1.

Crankcase Emission Control System. 

 A sealed-type

crankcase emission control system is used to eliminate
blow-by gases.  The blow-by gases are led to the
breather chamber through the crankcase.  Then, it is led
to the air cleaner.  Oil is separated from the gases while
passing through the inside of the breather chamber
from the crankcase, and then returned back to the
bottom of crankcase.

2.

Exhaust Emission Control System. 

 The exhaust

emission control system applied to this engine consists
of a carburetor and an ignition system having optimum
ignition timing characteristics.  The carburetor has been
calibrated to provide lean air/fuel mixture characteristics
and optimum fuel economy with a suitable air cleaner
and exhaust system.

Tampering w/Emission Control System Prohibited

Federal law and California State law prohibits the following acts or
the causing thereof: (1) the removal or rendering inoperative by
any person other than for purposes of maintenance, repair, or
replacement, of any device or element of design incorporated into
any new engine for the purpose of emission control prior to its sale
or delivery to the ultimate purchaser or while it is in use, or (2) the
use of the engine after such device or element of design has been
removed or rendered inoperative by any person.

Among those acts presumed to constitute tampering are the acts
listed below:
Do not tamper with the original emission related part.

>Carburetor and internal parts
>Spark plugs
>Magneto or electronic ignition system
>Fuel filter element
>Air cleaner elements
>Crankcase
>Cylinder heads
>Breather chamber and internal parts
>Intake pipe and tube

General Maintenance and Adjustments

1.

Fuel control system.

  To ensure personal safety,

adjustments should ONLY be made by a qualified LPG
system technician or an authorized service center,
using an exhaust gas analyzer.  Do not operate the
machine if carbon monoxide levels exceed OSHA
standards.

2.

Pad replacement.

  Tilt the machine back on its rear

caster to reach the pad centering device.  Turn the outer
ring counterclockwise to remove it.  Remove the old
pad.  Install the new pad by carefully centering it
against the "harpoon hook" plastic gripper.  Replace the
center locking ring.  Check rotation of the pad driver.
Eccentricity of the pad should not exceed 1/4 of an inch.

Содержание Burnisher

Страница 1: ...an 48906 Fax 517 484 9836 Email CustServe Michco com Web site www Michco Com Parts Web site www FloorMachineParts Com Order Parts on Line at www FloorMachineParts Com Directly to Parts Service By Emai...

Страница 2: ...aswell Youmusthavetrainingintheoperationofthismachinebeforeusingit If youroperator s cannot read English have this manual explained fully before attempting to operate this machine Si Ud o sus operado...

Страница 3: ...hcematic 37 Table of Contents This Owner s Manual Safety Procedures Guide has been prepared for the promotion of educational purposes only and Clarke does not claim or assume any responsibility for th...

Страница 4: ...mbustion powered engines may result in SERIOUS INJURY OR DEATH to the operator and those in the contaminated area The effects of CO can be experienced at different exposure levels depending on the hea...

Страница 5: ...ng When activity is concentrated to a smaller area as in a stripping application air stirring must be forced by the use of fans to reduce the risk of high concentrations of CO Air Quality Monitoring D...

Страница 6: ...onofCOeffects The toxic effects of carbon monoxide in the blood are the result of tissue hypoxia lack of oxygen carbon monoxide combines with hemoglobin to form carboxyhemoglobin Since CO and oxygen r...

Страница 7: ...ive Operating Zone and reduce high concentrations of CO Air exchange rates air exchange is defined as the exhausting of internal air to the external atmosphere the size of the Effective Operating Zone...

Страница 8: ...in as little or no CO crosses the Dividing Zone to be exhausted Notice the CO concentration and the Effective Operating Zone Expanded through the Dividing zone to the second vent with air exchange an...

Страница 9: ...to have carbon monoxide monitors with alarm capabilities in the workplace The direct reading instruments are frequently equipped with audio and or visual alarms and may be used for area and or persona...

Страница 10: ...4 5 0 5 0 0 0 1 2 3 4 5 6 7 8 9 1 0 T i m e h o u r s PPM 0 0 c h a n g e h r 1 2 c h a n g e h r 1 c h a n g e s h r 2 c h a n g e s h r 1 5 C O E m is s io n in 7 5 0 0 0 0 c u b ic fe e t w ith 4 8...

Страница 11: ...ment CO concentration production skyrockets when the air to fuel ratio becomes fuel rich Follow the recommended Maintenance Schedule for the engine found in the Engine Operator Owner Manual as well as...

Страница 12: ...d occur if the machine s power is on while changing thebuffingpadormakingmachineadjustments Nevertrytochangethebuffingpadorattempt to make machine adjustments while the engine is running DANGER Cigare...

Страница 13: ...truly PORTABLE equipment Propane buffers are best defined as ultra high speed buffers with the staying power to produce superior high gloss floor surfaces Upon contact with the floor the buffer shoul...

Страница 14: ...valve using an adapterandtheoutagevalve 2 Pressurize the container to approximately 15 psig with LP gas vapor Never purge with liquid LP gas To do so will cause the moisture vapor to chill and remain...

Страница 15: ...propane tank 2 ALWAYS allow the engine to run until it stops from lack of fuel ONLY IN AN EMERGENCY should the stop position on a HONDA throttle or the kill switch on a KAWASAKI and ONAN modelsbeused...

Страница 16: ...h a Phillips head on it Rotating the screw clockwise will increase the idle speed and this should cure the surging idle IF IT DOES NOT call our customer service depart ment for assistance 2 EXCESSIVE...

Страница 17: ...a shelf or a door frame Remove the sparkplug lead from the sparkplug and replace the boot with a new one The engine should now run normally IF IT DOES NOT Trouble Shooting contact our customer service...

Страница 18: ...Clarke Propane Burnishers Operator s Manual Page 17 Propane Floor Burnisher Equipment Section II Parts Manual 70076A...

Страница 19: ...Page 18 Clarke Propane Burnishers Operator s Manual Clarke 21 24 and 27 Frame Assemby 2 07 1 2 3 4 5 6 7 8 9 10 14 20 20A 20B 20C 19C 19A 16 18 15 13 12 11 19B 17...

Страница 20: ...Bolt 3 8 16 x 2 5 Hx Hd 1 12 170883 Lock Washer 3 8 1 13 170863 Washer Flat 3 8 1 14 61486A Tension Rotary 1 15 70468A Label Clarke 1 16 61485A Spacer 1 17 77336A Label Danger 1 18 98436A Bumper Stri...

Страница 21: ...e Assembly 8 00 Fig 1 Fig 2 Fig 3 Fig 4 Centrifugal Clutch UL listed machines Electric Clutch UL listed Machine V Twin Non Clutch Single Cylinder Non Clutch 1 2 10 3 6 4 19 8 7 9 6 13 12 11 14 15 16 8...

Страница 22: ...7A Handle Upper W40 1 8 98468A Washer Flat 2 9 85735A Screw Hex 13 x 1 25 2 10 98497A Washer 3 16 1 11 98717A Wire B006 3 12 98619A Handle Upper U L W401 1 13 98563A Switch Electric Clutch W08 1 14a 5...

Страница 23: ...Page 22 Clarke Propane Burnishers Operator s Manual Clarke Engine Assembly 1 07 KAWASAKI FH451V FH500V and FH541V V Twin...

Страница 24: ...asket 2 17 980652 Washer Lock 5 16 4 18 80049A Nut Hex 4 19 50003A Manifold 1 20 50017A Clamp 1 21 50002B Catalytic Convertor Vertical 1 21a 50894A Muffler Vertical 1 22 60010A Heat Shield 1 23 85737A...

Страница 25: ...Page 24 Clarke Propane Burnishers Operator s Manual Clarke 13 HP Engine Assembly 9 04 KAWASAKI FH 381V V Twin 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24...

Страница 26: ...Carburator FH381V 1 8 80074A Washer Wave 5 16 1 9 60003A Spud 1 10 50027A Oil Filter 1 11 98756A Hose 1 12 98805A Oil Drain 1 12A 50239A O Ring 1 13 98755A St Elbow 1 14 50015A Spark Plug 2 15 52825A...

Страница 27: ...ck 20 2 Ref Part Description Qty 16 40004A 14 HP Wiring Harness 1 16a 40000A 17 HP Wiring Harness 1 17 98711A W6821 Battery 12 Volt Non spill 1 18 98706A W6815 Cable Battery 11 Red 1 19 98701A W6811 S...

Страница 28: ...ose Assembly 3 1 8 50299A Hose 3 8 LP 1 9 18123A Regulators Asm Vacuum System 1 Ref Part Description Qty 12 Page 11 Carrier Bottle Ref 14A 98421A MAC815 Tank Aluminum Polished 1 14B 98422A MAC816 Tank...

Страница 29: ...Bearing W551 2 x x x 7 98460A Snap Ring External H022 2 x x x 8A 98581A Pulley 6 w o clutch W12A 1 x 8B 99033A Pulley 7 5 w clutch ZZZU13 1 x 8C 99033A Pulley 7 5 w o clutch ZZZU13 1 x 8D 99059A Pulle...

Страница 30: ...16 27P 1 x 8 56941A Centering Device 1 x x x x 9A 98605A Pad Gripper Ring 21 W20 1 x 9B 50867A Pad Gripper Ring 24 1 x 9C 50868A Pad Gripper Ring 27 1 x 10 98453A Rivet Pop Aluminum H013 11 x 98453A R...

Страница 31: ...21 Strip 21 Combo 22 Standard 22 w Clutch 22 Strip 24 Standard 24 w Clutch 24 w Battery 24 Strip 27 Standard 27 w Battery 28 Strip Strip Buff 24 Onan 27 Onan Belt Selection Chart 9 8 9 8 6 A 1 9 1 6 7...

Страница 32: ...Used 1 98579A 3 5 x 1 Pulley W11 All Burnishers w o clutch 2 98583A Electric Clutch W14 All Burnishers w electric clutch 3 98585A Centrifugal Clutch W142 2250 All Burnishers w centrifugal clutch exce...

Страница 33: ...Page 32 Clarke Propane Burnishers Operator s Manual Clarke Electrical Schematic 120V A C System 2 00...

Страница 34: ...Clarke Propane Burnishers Operator s Manual Page 33 Clarke KAWASAKI 14 HP Single Electrical Schematic 12V D C System 5 99...

Страница 35: ...Clarke KAWASAKI 14 HP Single Electrical Schematic Enivorgard III 12V D C System 5 99...

Страница 36: ...Clarke ElectricalSchematic KAWASAKI 17 HP TWIN 12 V DC Fuel System 5 99 Page 35 Clarke Propane Burnishers Operator s Manual...

Страница 37: ...Clarke KAWASAKI 17 HP TWIN Envirogard IV 12 Vdc System Electrical Schematic 8 01 Clarke Propane Burnishers Operator s Manual Page 36...

Страница 38: ...Clarke Onan P248 LP Engine 12V DC Fuel System Electrical Schematic 6 98 Page 37 Clarke Propane Burnishers Operator s Manual...

Страница 39: ...Page 38 Clarke Propane Burnishers Operator s Manual NOTES...

Страница 40: ...Giessendam The Netherlands 31 184 677 200 ALTO Sverige AB Molndal Sweden Aminogatan 18 Box 4029 S 431 04 Molndal 46 31 706 73 00 ALTO Norge A S Oslo Norway Bjornerudveien 24 N 1266 47 2275 1770 U S A...

Страница 41: ...ine date of purchase The defective battery must be returned to Clarke Returned batteries that are only in need of recharging will not be warranted EMISSION CONTROL SYSTEM In California the emission co...

Отзывы: