15
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
Repeat the same procedure for the opposite side of the roof.
Check and ensure all bottom cross rail connectors (4,5) are level and
horizontal, and are all the same height from the ground.
Tighten all nuts and bolts at this stage.
Fasten the black straps at the four corners with the ratchet tie-down (11).
The shed is now ready for use.
USING THE SHED
1. Check periodically (two to three times in the first week) and tighten the
ratchet tie-downs and all hardware if needed. You may need to remove
and re-set the ratchet to allow for more strap material becoming wound
around the ratchet spindle.
2. Open the door with the help of an assistant, rolling the fabric up until the
door can be held in position above the opening using the webbing straps
and buckles as shown above. (When not in use, tie the ends of the straps to
the webbing loops provided for that purpose.)
DISASSEMBLY
To dismantle, execute all instructions
in reverse order.
When disassembling the shed
depress the spring-loaded bar to
disengage the ratchet and open
the ratchet handle completely to
allow the webbing strap to pull
through.
Store your shed in a cool, dry
location between seasons to
prolong the usable life of all
components. Components are not equally durable and will require
replacement over time at differing intervals.
PLEASE RE-READ ALL WARNINGS ON PAGE 2 OF THESE INSTRUCTIONS. SAVE
THESE INSTRUCTIONS FOR FUTURE USE.
WARNING: IF POSITIONING THE SHED IN A WINDY LOCATION ALWAYS
ENSURE THE FRONT DOOR IS KEPT FULLY CLOSED TO PREVENT WIND
LIFTING THE SHED FROM INSIDEAND THAT THE SHED IS SECURELY
ANCHORED TO THE GROUND.