CLA-VAL 36 Series Скачать руководство пользователя страница 3

Adjust orifice button so that when it is in light contact with the

plug stem, the arm (10) slopes away from the cover about

1/15”.  Lock orifice button with lock nut (18).

5.

Install new cushion (15) with fastener items (29, 30, 34, &

18).

6.

Lay new cover gasket on clean surface and apply a gasket

compound  such  as  Permatex  #80065  to  both  surfaces.

Assemble gasket (6) and cover (2) over bolt holes in body

(1).

7.

Insert lubricated bolts (7) and tighten to the torques listed in

Table 2.

8.

Place valve back in service. Slowly open inlet isolation valve.

9.

BOLT SIZE

7/16”-14

1/2”-13

5/8”-11

3/4”-10

7/8”-9

TORQUE (FT. LBS.)

30

45

93

150

200

TABLE 2. VALVE COVER BOLT TORQUES

PARTS AND SERVICE

Parts and service are available from your local representative or

the  factory.    Make  note  of  the  valve  Model  No.  and  Working

Pressure located on the valve nameplate.

TROUBLESHOOTING

Several  problems  and  solutions  are  presented  below  to  assist

you in troubleshooting the valve assembly in efficient manner

Leakage at Bottom Connection

Tighten valve threaded connection.  If leaks persist, remove valve

and seals threads with pipe sealant or tape.

Leakage at Cover

Tighten bolts per Table 2, replace gasket.

Valve Leaks when Closed

Flush valve to remove debris. Disassemble and inspect seat, ori-

fice button and float. NOTE: Many floats contain sand for weight

but if water is detected replace float.

Valve not venting Air

Check  that  operating  pressure  does  not  exceed  Working

Pressure on nameplate.  Perform inspection steps 2-6 and dis-

assemble valve if problem persists.

DISASSEMBLY

The  valve  can  be  disassembled  without  removing  it  from  the

pipeline.  Or for convenience, the valve can be removed from the

line.    All  work  on  the  valve  should  be  performed  by  a  skilled

mechanic with proper tools.  No special tools are required.

CAUTION

: The valve must be drained before removing the 

cover or pressure may be released causing injury.

Close inlet shut-off valve.  Slowly open drain valve or remove

drain plug.  Remove the covers bolts (7) on the top cover.

1.

Pry cover (2) loose and lift off valve body.

2.

Remove the retainer ring (13) and pivot pin (12) that pass

through the float arm (10).

3.

To remove baffle (3), remove fasteners (8).

4.

Remove lock nut (18) and orifice button (11).

5.

Clean and inspect parts.  Note: some floats contain sand for

extra  weight;  if  water  is  detected,  replace  float.    Replace

worn parts as necessary and lubricate parts with FDA grease

such as Lubriko #Cw-606.  Remove all foreign matter from

body and cover.

6.

REASSEMBLY

All  parts  must  be  cleaned  and  gaskets  surfaces  should  be

cleaned with a stiff wire brush in the direction of the serration or

machine  marks.    Worn  parts,  gaskets  and  seal  should  be

replaced during reassembly.  Refer to Figure 6.

Apply Loctite Primer and 680 Compound to float threads and

assemble to arm (10).  Apply Loctite to bushing (9) and install

into baffle (3).

1.

Lay cover on flat surface with outlet faced down.  Lay seat

(4), plug (16), and baffle (3) over cover with screws (8) loose-

ly engaged.  Verify that plug moves up and down freely.  Lift

plug  and  drop  into  seat  until  baffle  is  positioned  and  plug

contacts seat smoothly; tighten screws to 5-10 ft. lbs.

2.

Screw new orifice button (11) into arm (10) with lock washer

(34) and lock nut (18).  Do not tighten nut at this time.

3.

Connect arm (10) to baffle (3) with pivot pin (12) and retain-

ing rings (13).

4.

Page 3

Содержание 36 Series

Страница 1: ...without dropping Valves should remain boxed clean and dry until installed to prevent weather related damage For long term storage greater than six months the valves must remain in the box and stored indoors Do not expose valves to sunlight or ozone for any extended periods DESCRIPTION OF OPERATION The Combination Air Valve is fully automatic and designed to continuously remove air accumulating at ...

Страница 2: ...N PIPING With the inlet shut off valve open partially open the drain valve until flow can be heard If the air valve is working prop erly water should be exhausted from the drain valve If air is exhausted follow steps 2 6 1 Close the inlet shut off valve 2 Slowly open the drain valve to allow the fluid in the valve to drain If draining is difficult the valve may be clogged valve requires service 3 ...

Страница 3: ...disassembled without removing it from the pipeline Or for convenience the valve can be removed from the line All work on the valve should be performed by a skilled mechanic with proper tools No special tools are required CAUTION The valve must be drained before removing the cover or pressure may be released causing injury Close inlet shut off valve Slowly open drain valve or remove drain plug Remo...

Страница 4: ...ia Ave Costa Mesa CA 92627 Phone 949 722 4800 Fax 949 548 5441 E mail info cla val com www cla val com Copyright Cla Val 2018 Printed in USA Specifications subject to change without notice N 36 Series Single Body R 01 2018 ...

Отзывы: