T-Series Traffic Director Installation, Configuration and Administration Guide
2-1
2. Installation
2
Installing the T1000
This T1000 installation procedure begins with an overview of the installation process and
continues with safety information, racking instructions, network and power connection, and
finally initial configuration. It has the following sections:
•
•
•
•
Handling Static-Sensitive Devices
•
Unpacking the Shipping Container
•
•
•
•
Connecting and Disconnecting AC Power
•
Connecting and Disconnecting DC Power
•
Accessing and Configuring the Management Plane
•
Accessing and Configuring the LOM Port
Note:
The T1000 is a series of hardware platforms that includes the T1010, T1100 and
T1200. This manual uses the generic term “T1000” to refer to all hardware
models of the T1000 Traffic Director, including the T1010, T1100, and T1200.
Specific model names are used only when necessary.
Overview of Installing T1000
This section provides a high-level overview of the T1000 installation procedure. If you have
previously installed T1000 systems, use the following steps as a guideline. If you have not
installed a T1000 before, read the steps in detail before performing the installation
procedures.
Step 1
Содержание ByteMobile T1010
Страница 10: ...x T Series Traffic Director Installation Configuration and Administration Guide...
Страница 14: ...Contents xiv T Series Traffic Director Installation Configuration and Administration Guide...
Страница 150: ...B 10 T Series Traffic Director Installation Configuration and Administration Guide Appendix B Replacement Parts...
Страница 168: ...Glossary Glossary 12 T Series Traffic Director Installation Configuration and Administration Guide...
Страница 172: ...Index Index 4 T Series Traffic Director Installation Configuration and Administration Guide...