Page 13
The gas supply pipe should be connected to the union (I), which is on the right next
to the wiring box on the back.
It is very important to have the connections done by a qualified technician, in order
to make sure that the installation is effected in accordance with the prevailing
standards and instructions.
The dryer should be connected to the type of gas, which is indicated on the serial plate.
The use of too small gas pipes can result in unsufficient gas supply, which can lead
to a bad heating-up and a poor drying quality.
When the dryer is used in combination with a weighing platform, the gas supply
pipe has to be made of flexible material to allow the weighing system to keep
moving freely.
I
It is important to work with the right gas pressure (see technical remarks) in order to
obtain a good ignition, heating and consequently a good operation in general.
After the gas supply has been connected, the gas tap in the dryer should be
turned on
(clockwise).
Test all connections for possible leaks by means of a soap solution, but
never with a flame.
Gas connection
Содержание HD30SL
Страница 11: ...Page 11 HD30SL Dryer Dimensions Illustration IPSO DR50...
Страница 19: ...Page 19 Steam Piping Installation Illustration...
Страница 60: ...Page 60...