Cisco UCS C24 M3 High-Density SFF Rack-Mount Server
8
CONFIGURING the SERVER
CONFIGURING the SERVER
Follow these steps to configure the Cisco UCS C24 M3 High-Density SFF Rack Server:
■
STEP 1 VERIFY SERVER SKU, page 9
■
■
■
STEP 4 SELECT RAID CONFIGURATION, page 14
■
STEP 5 SELECT HARD DISK DRIVES (HDDs), page 17
■
STEP 6 SELECT PCIe OPTION CARD(s), page 19
■
STEP 7 ORDER OPTIONAL NETWORK CARD ACCESSORIES, page 21
■
STEP 8 SELECT AC POWER CORD(s), page 24
■
STEP 9 ORDER POWER SUPPLIES, page 27
■
STEP 10 ORDER OPTIONAL REVERSIBLE CABLE MANAGEMENT ARM, page 28
■
STEP 11 ORDER A TRUSTED PLATFORM MODULE, page 29
■
STEP 12 ORDER OPTIONAL USB 2.0 DRIVES, page 30
■
STEP 13 SELECT OPERATING SYSTEM, page 31
■
STEP 14 SELECT OPERATING SYSTEM MEDIA KIT, page 33
■
STEP 15 SELECT OPTIONAL VALUE-ADDED SOFTWARE, page 34
■
STEP 16 SELECT SERVICE and SUPPORT LEVEL, page 35
■
OPTIONAL STEP - ORDER RACK(s), page 39
■