background image

 

6

Cabling the Cisco uBR10-MC5X20S/U/H Cable Interface Line Card with Universal Cable Holder—UCH2

OL-24878-01

  Installing the UCH

Step 3

Insert the cable completely into the UCH. (The cables will fit loosely in the holes until the lock bar is 
closed in 

Step 5

.)

Caution

Do not kink the cables.

Figure 5

Inserting a Cable in the UCH2

Step 4

Repeat this procedure for all of the cables.

Step 5

Ensure the cables are fully inserted in the UCH2 and slide the lock bar closed completely. (The lock bar 
will not close if cables are not fully inserted or properly aligned.)

Step 6

Using the T-10 TORX driver tool tighten the screws on the lock bar (maximum torque—10 in-lbs).

Installing the UCH

After the cables are installed in the UCH, perform the following steps to prevent ESD damage to the line 
card. 

Note

Before proceeding, remove the protective sticker covering the line card DS ports.

Step 1

Make sure that you are grounded using an ESD-preventive wrist or ankle strap.

Step 2

Attach a jumper cable to the ground point on the chassis.

Step 3

Briefly touch each cable’s center connector with the jumper cable to remove any built-up ESD potential.

US7

Blue

US17

Blue

US8

Green

US18

Green

US9

Yellow

US19

Yellow

1.

US = upstream

2.

DS = downstream

Table 2

Legacy 5-Color MC5X20 Quad-Shielded Cable Ports and Cable Colors (continued) 

Universal Cable Holder (1)

Universal Cable Holder (2)

Universal Cable Holder (3)

Line Card 
Port

Cable 
Color

RF Switch 
User Defined

Line Card 
Port

Cable 
Color

RF Switch 
User Defined

Line Card 
Port

Cable 
Color

RF Switch 
User Defined

155826

Содержание uBR10-MC5X20H

Страница 1: ...the Cisco uBR10 MC5X20S U H Cable Interface Line Card with Universal Cable Holder UCH2 Last Updated May 14 2009 OL 24878 01 Contents This document contains the following information Feature Description Installing the Cables Installing the UCH Removing the UCH Removing the Cables Troubleshooting Related Documentation ...

Страница 2: ... US18 US19 DS0 DS1 DS2 DS3 DS4 RF RF RF RF RF uBR10 MC5x20S D POWE R STATU S MAINT US0 US1 US2 US3 US4 US5 US6 US7 US8 US9 US10 US11 US12 US13 US14 US15 US16 US17 US18 US19 DS0 DS1 DS2 DS3 DS4 RF RF RF RF RF uBR10 MC5x20S D POWE R STATU S MAINT US0 US1 US2 US3 US4 US5 US6 US7 US8 US9 US10 US11 US12 US13 US14 US15 US16 US17 US18 US19 DS0 DS1 DS2 DS3 DS4 RF RF RF RF RF uBR10 MC5x20S D POWE R STATU S...

Страница 3: ...the other end This cable is 9 84 feet 3 m long and the part number is CAB RFSW520QTIMF2 Figure 2 Cable Bundle with UCH2 Units and F Connectors Figure 3 shows the cable bundle for Cisco uBR10 MC5X20S U H cable interface line card to RF switch that has three UCH2 units attached to one end and two RF switch header blocks attached to the other end This cable is 3 2 feet 1 m long and the part number is...

Страница 4: ...isco Please refer to Table 3 for the applicable Cisco part numbers Tools required for cable installation include 1 4 in slotted screwdriver and T 10 TORX driver Also see Tool Manufacturers and Part Numbers Note The following instructions describe the connection process for the customized RF cables and the maintenance of the Cisco preconfigured cable bundles Installing the Cables The UCH must be us...

Страница 5: ... Holder 1 Universal Cable Holder 2 Universal Cable Holder 3 Line Card Port Cable Color RF Switch User Defined Line Card Port Cable Color RF Switch User Defined Line Card Port Cable Color RF Switch User Defined US1 0 1 US upstream Red US10 Grey DS2 0 2 DS downstream Red US1 White US11 Brown DS1 White US2 Blue US12 Red DS2 Blue US3 Green US13 White DS3 Green US4 Yellow US14 Blue DS4 Yellow US5 Viole...

Страница 6: ...the UCH After the cables are installed in the UCH perform the following steps to prevent ESD damage to the line card Note Before proceeding remove the protective sticker covering the line card DS ports Step 1 Make sure that you are grounded using an ESD preventive wrist or ankle strap Step 2 Attach a jumper cable to the ground point on the chassis Step 3 Briefly touch each cable s center connector...

Страница 7: ...bs maximum torque 15 in lbs Caution Torquing the leadscrew to more than 20 in lbs can cause the leadscrew to fail The UCH is fully engaged when the semi circles on the shroud show metal and the red and black lines are completely covered See Figure 6 Removing the UCH Step 1 Make sure that you are grounded using an ESD preventive wrist or ankle strap Step 2 Loosen the lead screw counterclockwise unt...

Страница 8: ...de you want to remove cables Step 2 Slide the lock bar open by hand or with a flathead screwdriver if the bar is stuck or hard to access See Figure 8 Make sure the lock bar is completely open or the cables will not release Caution Be careful not to bend the cables Step 3 Carefully pull the cable out of the hole Figure 8 Sliding Open the Lock Bar US0 US1 US2 US3 US4 US5 US6 US7 US8 US9 155819 Red l...

Страница 9: ... be present Contact Cisco TAC for further information http www cisco com tac Tool Manufacturers and Part Numbers Table 3 Tool Part Numbers Cisco Systems 1 Cable bundle for RF card to HFC plant 3 UCH2 units attached to one end and F connectors attached to the other end 9 84 feet 3 m long 2 Cable bundle for RF card to RF switch 3 UCH2 units attached to one end and 2 RF switch header blocks attached ...

Страница 10: ... the documents listed in the Related Documentation required for IOS optional for other section Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and or its affiliates in the U S and other countries To view a list of Cisco trademarks go to this URL www cisco com go trademarks Third party trademarks mentioned are the property of their respective owners The use of the word par...

Отзывы: