
2-7
Cisco Physical Access Gateway User Guide
OL-32499-01
Chapter 2 Installing and Configuring the Cisco Physical Access Gateway
Installing the Cisco Physical Access Gateway
Installing the Cisco Physical Access Gateway
•
Before You Begin, page 2-7
•
Procedure, page 2-7
Before You Begin
Before you install a Cisco Physical Access Gateway, verify the following:
•
Verify that the module has access to a power source. See the
“Power Options and Requirements”
section on page 1-12
for more information.
•
Verify that you have the necessary mounting brackets or other hardware. See the
“Mounting a
Gateway or Optional Module” section on page 1-14
.
Procedure
To install the Cisco Physical Access Gateway, perform the following procedure:
Step 1
Mount the Gateway to a wall. See the
“Mounting a Gateway or Optional Module” section on page 1-14
for more information.
Step 2
Connect the Gateway to a power source.
•
If using a DC power source, insert a two-pin connector plug into the DC power port (
Figure 2-4
),
and connect the Voltage In (VIN) and ground (GND) wires.
•
If using PoE, connect an Ethernet cable from the IP network to the ETH0 port (
Figure 2-4
).
See the
“Power Options and Requirements” section on page 1-12
for more information.