5-24
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 5 Turn Up Network
NTP-A216 Provision a Traditional Path Protection Dual-Ring Interconnect
b.
Complete the
“DLP-A516 Export CTC Data” task on page 22-6
to export the conditions
information.
Step 24
Repeat Steps
through
for each node on the network.
Step 25
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application. Continue with
Chapter 6, “Create Circuits and VT Tunnels.”
Stop. You have completed this procedure.
NTP-A216 Provision a Traditional Path Protection Dual-Ring
Interconnect
Note
To route circuits on the DRI, you must check the Dual Ring Interconnect check box during circuit
creation.
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
. If you are already logged in, continue with
Step
.
Step 2
Complete the following steps if you have not provisioned the path protection configurations that you will
interconnect in a path protection DRI. If the path protection configurations are created, go to Step
a.
Complete the
“NTP-A44 Provision Path Protection Nodes” procedure on page 5-20
to provision the
path protection configurations.
b.
Complete the
“NTP-A177 Path Protection Acceptance Test” procedure on page 5-22
to test the path
protection configurations.
Note
All path protection configurations that will be interconnected must have the same OC-N rate.
Step 3
Verify that the path protection DRI interconnect nodes have OC-N cards installed and have fiber
connections to the other interconnect node:
•
The OC-N cards that will connect the path protection configurations must be installed at the
interconnect nodes. The OC-N cards in the path protection nodes and the interconnect nodes must
be the same type.
Purpose
This procedure provisions path protection configurations in a traditional
DRI topology. DRIs interconnect two or more path protection
configurations to provide an additional level of protection.
Tools/Equipment
None
Prerequisite Procedures
NTP-A35 Verify Node Turn-Up, page 5-2
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Provisioning and higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...