13-10
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 13 Convert Network Configurations
NTP- D351 Convert a Point-to-Point or Linear ADM to an SNCP Automatically
Step 12
Complete the
“DLP-D363 Provision Regenerator-Section DCC Terminations” task on page 20-68
end nodes; provision the slot in each node that is not already in the RS-DCC Terminations list (in the
example, Port 1 of Node 1/Slot 5 and Port 1 of Node 3/Slot 13). (Alternatively, if additional
bandwidth is needed for CTC management, complete the
“DLP-D364 Provision Multiplex-Section DCC
Terminations” task on page 20-71
Step 13
For circuits provisioned on a VC4 that is now part of the protection bandwidth (VC4s 3 to 4 for an
STM-4 MS-SPRing, VC4s 9 to 16 for an STM-16 MS-SPRing, and VC4s 33 to 64 for an STM-64),
delete and recreate each circuit:
a.
Complete the
“DLP-D27 Delete Circuits” task on page 17-21
for one circuit.
b.
Create the circuit on VC4s 1 to 2 for an STM-4 MS-SPRing, 1 to 8 for an STM-16 MS-SPRing, or
1 to 32 for an STM-64 MS-SPRing on the fiber that served as the protect fiber in the linear ADM.
See the
“NTP-D324 Create a Manually Routed High-Order Circuit” procedure on page 6-60
instructions.
c.
Repeat Steps
and
for each circuit residing on an MS-SPRing protect VC4.
Step 14
Complete the
“NTP-D41 Create the MS-SPRing” procedure on page 5-13
to put the nodes into an
MS-SPRing.
Stop. You have completed this procedure.
NTP-D351 Convert a Point-to-Point or Linear ADM to an SNCP
Automatically
Note
When upgrading VT tunnels, CTC does not convert the VT tunnel to SNCP, but instead creates a
secondary tunnel for the alternate path. The result is two unprotected VT tunnels using alternate paths.
Note
If overhead circuits exist on the network, an in-service topology upgrade is service affecting. The
overhead circuits will drop traffic and have a status of PARTIAL after the upgrade is complete.
Step 1
Complete the
“DLP-D60 Log into CTC” task on page 17-49
at a node on the point-to-point or linear
ADM. If you are already logged in, continue with Step 2.
Step 2
If the point-to-point or linear ADM is 1+1 protected, complete the
. If the point-to-point or linear ADM is unprotected, continue with
.
Purpose
This procedure upgrades a point-to-point or linear ADM to an SNCP
without disrupting traffic. You can upgrade synchronous transport signal
(STS), Virtual Tributary (VT), and VT tunnel circuits to SNCP. This
option is a single circuit operation.
Tools/Equipment
None
Prerequisite Procedures
NTP-D124 Provision a Point-to-Point Network, page 5-3
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 SDH
Страница 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Страница 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 66: ...xxvi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Страница 414: ...16 4 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Chapter 16 Power Down the Node NTP D114 Power Down the Node ...
Страница 832: ...A 14 Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 860: ...Index IN 28 Cisco ONS 15454 SDH Procedure Guide R6 0 78 17194 01 ...