Unpack and Verify Cisco NCS 1001
Procedure
Step 1
When you receive Cisco NCS 1001 equipment at the installation site, open the top of the box. The Cisco Systems logo is
on the side of the box.
Step 2
Remove accessories and foam inserts from the box. The box contains Cisco NCS 1001 and other items needed for installation.
Step 3
To remove the shelf, grasp the side of the shelf and lift the shelf out of the box.
Step 4
Verify that you have all items.
Step 5
Verify the following:
•
Cisco NCS 1001 is not damaged.
•
The cable connectors, management ports, console ports, and power connectors are not damaged.
•
The SFP cages on the front panel are not damaged.
•
Verify that outstanding scratch, mark, bend, discoloration or deformation has not occurred to NCS 1001.
Step 6
If there is any damage, call your Cisco sales engineer for a replacement.
Содержание NCS 1001
Страница 1: ...Quick Start Guide for Cisco NCS 1001 ...
Страница 24: ...Step 3 Integrate the slider to the two post 19 rack Figure 17 Slider Integration to the Two Post 19 Rack 24 ...
Страница 25: ...Left side four post slide assembly 1 25 ...
Страница 30: ...30 ...
Страница 34: ...34 ...
Страница 39: ... 2018 Cisco Systems Inc All rights reserved ...