
Revised: April 13, 2018,
Install Four Post Slider into EIA/ANSI Rack
Procedure
Step 1
Identify the four post slider.
Figure 9: Four Post Slider Identification
Check for the left/right marking on the sliders. This is left front sliding rail.
1
Check for the left/right marking on the sliders. This is left rear sliding rail.
2
16
Содержание NCS 1001
Страница 1: ...Quick Start Guide for Cisco NCS 1001 ...
Страница 24: ...Step 3 Integrate the slider to the two post 19 rack Figure 17 Slider Integration to the Two Post 19 Rack 24 ...
Страница 25: ...Left side four post slide assembly 1 25 ...
Страница 30: ...30 ...
Страница 34: ...34 ...
Страница 39: ... 2018 Cisco Systems Inc All rights reserved ...