![Cisco MERAKI MR44 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/cisco/meraki-mr44/meraki-mr44_installation-manual_67940013.webp)
2. Using the dashed lines on the mount cradle template as a guide, set the proper spacing of the T-rail clips on the T-
rail.
3. Tighten the set screws on the T-rail clips to secure the clips using a 5/64”(2 mm) hex key.
[One of four set screws indicated]
4. Attach the mount cradle to the T-rail clips using the mount cradle holes (marked with a “T“).
Tip: Pre-assemble rubber spacers and screws to the mount cradle. The mount cradle can then be held with one hand
while the other hand holds a screwdriver. If mounting your AP to a dropped ceiling, skip to the "Getting Power to the AP"
section.
Electrical Junction Box Mount Using Mount Cradle
The access point can be mounted to a 4” square cable junction box, a 3.5 or 4” round cable junction box, or various U.S.
and European outlet boxes (mounting screws are not included).
Using appropriate mounting hardware for your specific type of junction box, attach the mount cradle to the junction box.
13
Содержание MERAKI MR44
Страница 3: ...3 ...