Attaching the Rack-Mount Brackets
Procedure
Use two Phillips flat-head screws (for Catalyst 6800IA-48FPD and 6800IA-48TD) or four Phillips flat-head
screws (for Catalyst 6800IA-48FPDR) to attach the long side of the bracket to each side of the switch.
Figure 19: Attaching Brackets for 19-inch Racks (Catalyst 6800IA-48FPD and 6800IA-48TD)
Figure 20: Attaching Brackets for 19-inch Racks (Catalyst 6800IA-48FPDR)
Catalyst 6800IA Switch Hardware Installation Guide
28
OL-30278-02
Switch Installation
Rack-Mounting