Chapter 2 Installing and Starting the Switch
Connecting to DC Power
2-32
Catalyst 3550 Multilayer Switch Hardware Installation Guide
78-11358-03
Figure 2-31 Torquing the Terminal-Block Captive Screws
Step 6
Repeat Steps 4 and 5 for the remaining three DC-input power source wires.
shows the completed wiring of a terminal block plug.
60533
Torque to 4.5 lbf-in. (72 ozf-in.)