C H A P T E R

 

3-1

Cisco AVS 3120 Application Velocity System Hardware Installation Guide

OL-11805-01

3

Installing the AVS 3120

This chapter explains how to install the AVS 3120 in an equipment rack, or on a table or workbench. 
This chapter also provides instructions for connecting cables, AC power, and for booting the AVS 3120.

Warning

Read the installation instructions before connecting the system to the power source. 

Statement 1004

This chapter contains the following major sections:

Unpacking and Inspecting the AVS 3120, page 3-2

Installing Your AVS 3120, page 3-2

Connecting Cables, page 3-6

Connecting AC Power, page 3-7

Booting the AVS 3120, page 3-8

Establishing a Serial Console Connection, page 3-9

Configuring Network Settings, page 3-10

Setting the Time, page 3-12

Checking the Front Panel LEDs, page 3-13

Removing or Replacing an AVS 3120, page 3-14

Before you begin the installation, be sure you have read the 

Regulatory Compliance and Safety 

Information for the Cisco AVS 3120 Application Velocity System

 document and 

Chapter 2, “Preparing 

for Installation.”

Also, you may want to familiarize yourself with the AVS software by reading the following related 
documents, which you can obtain from Cisco.com:

Release Note for the Cisco Application Velocity System

Cisco Application Velocity System User Guide

Содержание AVS 3120

Страница 1: ...S 3120 page 3 2 Connecting Cables page 3 6 Connecting AC Power page 3 7 Booting the AVS 3120 page 3 8 Establishing a Serial Console Connection page 3 9 Configuring Network Settings page 3 10 Setting the Time page 3 12 Checking the Front Panel LEDs page 3 13 Removing or Replacing an AVS 3120 page 3 14 Before you begin the installation be sure you have read the Regulatory Compliance and Safety Infor...

Страница 2: ...tlined in Chapter 2 Preparing for Installation If the Product is Damaged If any portion of the unit or component is damaged in transit forward an immediate request to the delivering carrier to perform an inspection of the product and to prepare a damage report Save the container and all packing materials until the contents are verified Concurrently report the nature and extent of the damage to Cus...

Страница 3: ...lign the bracket with the screw holes in the AVS 3120 and use two round head screws to secure the bracket Repeat this step to attach the left hand bracket to the AVS 3120 Note that the brackets are different Warning To prevent bodily injury when mounting or servicing this unit in a rack you must take special precautions to ensure that the system remains stable The following guidelines are provided...

Страница 4: ... servicing the system You can use the two threaded holes to mount a ground lug to ground the chassis 2 Select a location in the rack to mount the AVS 3120 and then position the AVS 3120 and brackets in the rack 3 Align the right side bracket on the AVS 3120 to the front of the rack and then insert and tighten the two round head retaining screws to secure the AVS 3120 to the rack as shown in Figure...

Страница 5: ...ponent failures There must be approximately 19 inches 48 26 cm of clearance at the front and rear of the chassis for accessing network cables and equipment The AVS 3120 must receive adequate ventilation Follow these steps to install the AVS 3120 on a workbench or tabletop 1 Remove any debris and dust from the tabletop or workbench as well as from the surrounding area Ensure that your path between ...

Страница 6: ...ty System and the Cisco Application Velocity System User Guide Note The 100BASE TX 1000BASE T Ethernet standard requires that you use standard four twisted pair Category 5e cable at lengths up to 328 08 ft 100 m Figure 3 3 Ethernet Port 1 2 Connect the other end of the network cables to a hub or switch in your network 3 Connect the console cable as shown in Figure 3 4 so that you have either a DB ...

Страница 7: ... Installation 2 Attach the grounding lug to the side of the appliance Note Use 8 32 screws to connect a copper standard barrel grounding lug to the holes The appliance requires a lug where the distance between the center of each hole is 0 56 inches 1 42 cm The ground lug must be NRTL listed or recognized In addition the copper conductor wires must be used and the copper conductor must comply with ...

Страница 8: ...bout configuring and administering the AVS 3120 device Booting with a Console Connected If you boot the device while a console is connected to the serial port see the next section a boot menu is displayed on the console like this Launching BootLoader Boot configuration file contains 2 entries GNU GRUB version 1 0 11 0 631K lower 4062208K upper memory 0 Cisco AVS Runtime Image 1 Cisco AVS Maintenan...

Страница 9: ...g procedure uses HyperTerminal for Windows a Launch HyperTerminal The Connection Description window appears b Enter a name for your session in the Name field c Click OK The Connect To window appears d From the drop down list choose the COM port to which the device is connected e Click OK The Port Properties window appears f Set the port properties Baud Rate 9600 Data Bits 8 Flow Control none Parit...

Страница 10: ...able writing configuration settings with the enable command velocity enable Step 3 Configure the network interface with the set interface command velocity set interface ip ip netmask mask default gateway gw autoneg on where ip is the device interface IP address such as 10 210 10 45 mask is the device interface network mask such as 255 255 255 0 gw is the gateway address such as 10 210 2 1 autoneg ...

Страница 11: ...P server or manually by using the set date time command To use an NTP server use the set ntp command as follows velocity set ntp start ip where start can be start to start using NTP or stop to stop using NTP ip is the NTP server IP address or fully qualified domain name such as 10 68 226 100 or time nst gov You can view the NTP settings by using the show ntp command velocity show ntp STATUS RUNNIN...

Страница 12: ...ronized among all of the deployed AVS devices and the origin servers It is important to synchronize all clocks whenever a new device is deployed Here is a summary of the ways to set the clock on an AVS device Use the set date command to set the date time and local time zone Use the set ntp command to configure the AVS device to get its time from an NTP time synchronization source The NTP source sh...

Страница 13: ...LEDs and Table 3 1 describes their function Figure 3 5 Front Panel LEDs Table 3 1 Front Panel LED Indicators Indicator Color State Indicates 1 Power Green On The AVS 3120 is on Off The AVS 3120 is off 2 Status Green On Normal operation system has passed power up diagnostics Blinking Power up diagnostics are running or the system is booting Amber On Power up diagnostics have failed 3 Compact flash ...

Страница 14: ...weroff command To do this a Access the CLI and open the shell by using the sysopen command velocity sysopen b Change to the root user using the su command with the dash option bash 2 05b su root c Enter the root password the default is FineGr0und5 password d Execute the poweroff command sh 2 05b sbin poweroff 2 Power down the AVS 3120 by turning off the power switch on the rear panel of the AVS 31...

Отзывы: