2-4
Cisco Integrated Services Router Hardware Installation Guide
Chapter 2 Installing the Router
Installing the Cisco 810 ISR
Figure 2-2
6-32 Screws
Step 3
Connect the supplied plenum rated Cat5 cable to the GE0 port on the PoE+ splitter.
Step 4
Connect the Cat5 cable from your PoE+ source to the PoE+ in port on the PoE+ splitter.
Step 5
Place the power cord lock onto the power cord behind the connector overmold as shown in
Figure 2-3
.
Slide the power cord lock forward so that it captures the overmold and is fully seated.
Figure 2-3
Placement of the Power Cord Lock onto the Power Cord
285668
1
2
3
4
1
6-32 screws
3
To PoE+ power source
2
Power cable with power cord lock installed
4
GE CAT5 cable
345076
1
2
1
Power cord connector
2
Power cord lock
Содержание 860 Series
Страница 8: ...Contents 6 Cisco Integrated Services Router Hardware Installation Guide ...
Страница 13: ...xi Cisco Integrated Services Router Hardware Installation Guide ...
Страница 15: ...xiii Cisco Integrated Services Router Hardware Installation Guide ...
Страница 20: ...xviii Cisco Integrated Services Router Hardware Installation Guide ...