C H A P T E R
2-1
Catalyst 8540 Chassis Installation Guide
78-6134-03
2
Installing the Chassis
This chapter describes how to prepare your site for installation, and to install and
power up your chassis. This chapter contains the following sections:
•
Site Planning
•
Rack-Mounting the Chassis
•
Installing Power Supplies
•
Connecting Power to the Chassis
Warning
Before you install, operate, or service the system, read the
Site
Preparation and Safety Guide
. This guide contains important
safety information you should know before working with the
system.
Site Planning
Planning the proper location and layout of your equipment rack or wiring closet
is essential for successful system operation. Equipment placed in an inadequately
ventilated area can cause system overtemperature conditions. In addition, poor
equipment placement can make chassis panels inaccessible and difficult
to maintain.
Содержание 8540 - Catalyst Campus Switch Router Modular Expansion Base
Страница 6: ......
Страница 24: ...Chapter 1 Product Overview Fan Assembly 1 6 Catalyst 8540 Chassis Installation Guide 78 6134 03 ...
Страница 63: ...5 Catalyst 8540 Chassis Installation Guide 78 6134 03 Index description ix translations B 1 ...
Страница 64: ...Index 6 Catalyst 8540 Chassis Installation Guide 78 6134 03 ...